The warning tape around the work site
Anything that prevents the flow of wellbore fluids
An overbalanced fluid
BOP locking stems
Rate this question:
Positive and negative
Pump on and pump closed
Mechanical and fluid
Overbalanced and underbalanced
Primary and secondary
Upper and lower
Rate this question:
Seawater
Diesel
Brine
Nitrogen
Condensate
Drilling mud
Rate this question:
Volumetric
Forward circulation
Wait and Weight
Bullheading
Concurrent
Rate this question:
The SIDPP is higher than SICP
The SIDPP is lower than SICP
The SIDPP is equal to SICP
None of the above
Rate this question:
The pressures at the casing are the same regardless of the kill method used
When the drill string volume is more than annulus open hole volume
When annulus open hole volume is less than the drill string volume
When the drill string volume is less than the open hole volume
Rate this question:
To determine how much to allow casing pressure to increase at the start of a kill operation
To determine how much to allow drill pipe pressure to increase at the start of a kill operation
To determine if the choke and kill lines should be used during the kill operation
To help determine possible pressure increase during the final stages of a well kill
Rate this question:
1020 psi
922 psi
556 psi
432 psi
Rate this question:
Enable a lower kill pump rate
To minimize Formation Pressure
To enable a higher kill pump rate
To ensure formation fluid compatibility
To reduce annulus losses
Rate this question:
TVD
MD
Rate this question:
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.