1.
The fine for performing electrical work without having a valid certificate of competency
or electrical training certificate is______________
Correct Answer
B. $250 first offense, $500 per offense thereafter
Explanation
The correct answer is $250 first offense, $500 per offense thereafter. This means that if someone is caught performing electrical work without a valid certificate of competency or electrical training certificate for the first time, they will be fined $250. If they are caught again in the future, the fine will increase to $500 for each subsequent offense.
2.
Only licensed _______________ contractors can use
provisional electrical work permits
Correct Answer
B. Electrical or telecommunications
Explanation
Provisional electrical work permits can only be used by contractors who are licensed in either electrical or telecommunications. This means that only contractors who have the necessary qualifications and expertise in these specific fields are allowed to perform electrical work under the provisional permits.
3.
The department will issue an electrical/telecommunications contractor's
license that will expire __________ following the date of issue to a person,
firm, partnership, corporation or other entity that complies with requirements for
such license in chapter 19.28 RCW
Correct Answer
C. 24 months
Explanation
The department will issue an electrical/telecommunications contractor's license that will expire 24 months following the date of issue to a person, firm, partnership, corporation or other entity that complies with requirements for such license in chapter 19.28 RCW.
4.
A friend, neighbor, relative, or other person (including a certified electrician) may assist a householder, at his/her residence in
the performance of electrical work on the condition that the householder is _________, and the person assisting the householder does not accept money or other forms of compensation for the volunteer work
Correct Answer
D. Present when the work is performed
Explanation
The correct answer is "present when the work is performed". This means that the householder must be physically present at the residence while the electrical work is being done. This requirement ensures that the householder is actively involved and overseeing the work being done, even if they are receiving assistance from someone else. It also emphasizes the importance of the householder's presence for safety reasons, as electrical work can be dangerous if not properly supervised.
5.
An individual who has not completed the required hours of continuing
education can renew an administrator's certificate if the individual applies for
renewal on or before the certificate expires and pays the appropriate renewal fee.
However, the certificate will ______________.
Correct Answer
A. Be placed in an inactive status
Explanation
If an individual who has not completed the required hours of continuing education applies for renewal of their administrator's certificate before it expires and pays the renewal fee, their certificate will be placed in an inactive status. This means that although the certificate is renewed, it will not be active or valid until the individual completes the necessary continuing education hours.
6.
"Administrator" means a person designated by an electrical contractor to _____________ in accordance with the rules adopted under this chapter.
Correct Answer
B. Supervise electrical work and electricians
Explanation
The term "Administrator" refers to someone who is appointed by an electrical contractor to supervise electrical work and electricians. This means that the Administrator is responsible for overseeing and managing the tasks related to electrical work, ensuring that everything is done correctly and in accordance with the rules and regulations outlined in this chapter. They are in charge of supervising the electricians and ensuring that the work is carried out safely and efficiently.
7.
"Electrical construction trade" includes but is not limited to installing or
maintaining electrical wires and equipment that are used for _______________ and
installing and maintaining remote control, signaling, power limited, or communication
circuits or systems
Correct Answer
D. All of the above
Explanation
The correct answer is "all of the above" because the phrase "includes but is not limited to" indicates that the electrical construction trade involves not only installing or maintaining electrical wires and equipment used for light, heat, and power, but also includes installing and maintaining remote control, signaling, power limited, or communication circuits or systems. Therefore, all of these options are included within the scope of the electrical construction trade.
8.
All electrical contractor licenses expire ____________ following the day of their issue.
Correct Answer
C. 24 calendar months
Explanation
Electrical contractor licenses expire 24 calendar months following the day of their issue. This means that the licenses are valid for a period of two years from the date of issue. After this time, contractors must renew their licenses to continue working legally in the electrical field.
9.
Anyone failing an administrator or electrician competency examination
may retake the examination by ________________.
Correct Answer
D. Waiting 14 calendar days and paying the retesting fees
Explanation
If someone fails an administrator or electrician competency examination, they have the option to retake the examination. However, they must wait for a specific period of time before they can retake the exam. In this case, the correct answer is waiting 14 calendar days. Additionally, they are also required to pay the retesting fees in order to retake the examination.
10.
When the supervising electrician is found to not be present on the job site, the trainee will be given a form by the inspector that must be ____________________ to the inspector
Correct Answer
B. Signed by supervising electrician and returned
Explanation
When the supervising electrician is not present on the job site, the trainee receives a form from the inspector. This form must be signed by the supervising electrician and then returned to the inspector. This ensures that the supervising electrician acknowledges their absence and maintains compliance with regulations. It's a safeguard to ensure proper supervision and adherence to safety and training protocols on the job site.
11.
All alterations to mobile homes electrical systems must be inspected by what authority in Washington?
Correct Answer
D. The Factory Assembled structures section of the Dept.
Explanation
In Washington, all alterations to mobile homes electrical systems must be inspected by the Factory Assembled structures section of the Department. This authority is responsible for ensuring that the electrical modifications made to mobile homes meet the necessary safety standards and regulations. They have the expertise and knowledge to assess the electrical systems and ensure that they are installed correctly and do not pose any hazards. The Manufacturer, Fire Marshall, and Chief Electrical Inspector may have their own roles and responsibilities, but they are not specifically designated to inspect alterations to mobile homes electrical systems in Washington.
12.
An appeal must be filed within ______ days after the notice of the decision or penalty is given to the assessed party.
Correct Answer
D. 20
Explanation
An appeal must be filed within 20 days after the notice of the decision or penalty is given to the assessed party. This means that the assessed party has a limited time frame of 20 days to submit their appeal in order to challenge the decision or penalty they have received. Failing to file the appeal within this time period may result in the assessed party losing their opportunity to contest the decision or penalty.
13.
Extension cords are permitted to supply portable outdoor signs. True or False?
Correct Answer
B. False
Explanation
Extension cords are not permitted to supply portable outdoor signs. This is because extension cords are not designed to handle the power requirements of outdoor signs, which may be larger and more demanding than typical household appliances. Using extension cords for this purpose can create a safety hazard, such as overheating and electrical fires. It is recommended to use properly installed and grounded electrical outlets or dedicated circuits for supplying power to outdoor signs.
14.
If the board sustains the decision of the department, the ____________ shall be applied by the department to the payment of the per diem and expenses of the members of the board incurred in the matter, and any balance remaining after payment of per diem and expenses shall be paid into the electrical license fund.
Correct Answer
B. 200 Dollars
Explanation
If the board sustains the decision of the department, the amount of 200 dollars shall be applied by the department to the payment of the per diem and expenses of the members of the board incurred in the matter, and any balance remaining after payment of per diem and expenses shall be paid into the electrical license fund.
15.
In the Departments jurisdiction, a provisional electrical work permit label may not be posted in lieu of an electrical work permit.
Correct Answer
B. False
Explanation
In the given statement, it is stated that a provisional electrical work permit label may not be posted in lieu of an electrical work permit. This means that a provisional label cannot be used as a substitute for an actual electrical work permit. Therefore, the correct answer is False.
16.
Installations greater than _____ standard four-pair cables or ten standard twenty-five pair cables require permits and inspections?
Correct Answer
B. 60
Explanation
Installations greater than 60 standard four-pair cables or ten standard twenty-five pair cables require permits and inspections. This means that if the number of cables exceeds 60 for four-pair cables or ten for twenty-five pair cables, the installation process must be regulated and authorized by obtaining permits and undergoing inspections.
17.
The NEC code book is prima facie of the RCW 19.28?
Correct Answer
A. True
Explanation
The NEC code book is prima facie evidence of the RCW 19.28. This means that the NEC code book is considered to be sufficient evidence of the RCW 19.28 without further proof or investigation. In other words, if the NEC code book states something about the RCW 19.28, it is generally accepted as true unless proven otherwise.
18.
The support wires must be a minimum of ______ and be securely fastened to the structural ceiling and ceiling grid system?
Correct Answer
A. 12 AWG
Explanation
The support wires must be a minimum of 12 AWG because a smaller gauge wire may not be able to handle the weight and stress of supporting the ceiling. A larger gauge wire, such as 10 AWG, would be unnecessarily thick and may be more difficult to work with and secure properly. 14 AWG and 16 AWG wires are also too small and may not provide enough strength and stability for the ceiling support. Therefore, 12 AWG is the most appropriate choice for ensuring the support wires are strong enough and securely fastened to the structural ceiling and ceiling grid system.
19.
Without exception, corrections for failed inspections within fifteen days of notification by the department are acceptable?
Correct Answer
B. False
Explanation
While many jurisdictions may allow a period (like 15 days) for corrections to be made following a failed inspection, saying "without exception" is too absolute. There are often specific circumstances or types of violations that may require immediate action or may not be resolved within the standard timeframe due to their severity or complexity. Additionally, policies can vary significantly by location and the specific regulations of a department or agency.
20.
A medical device which is not in violation of the Medical Device Amendments is approved by ______?
Correct Answer
C. FDA (Food and Drug Administration)
Explanation
The correct answer is FDA (Food and Drug Administration). The FDA is responsible for regulating and approving medical devices in the United States. The Medical Device Amendments refer to a set of laws that were enacted to ensure the safety and effectiveness of medical devices. Therefore, for a medical device to be approved and not in violation of these amendments, it must be approved by the FDA.
21.
For rod, plate, and ground electrodes, If a ground resistance test is not performed to ensure a resistance to ground of _______ohms or less, two or more electrodes must be installed a minimum of six feet apart.
Correct Answer
A. Twenty-five
Explanation
If a ground resistance test is not performed to ensure a resistance to ground of twenty-five ohms or less, two or more electrodes must be installed a minimum of six feet apart.
22.
Incidental short sections of circular or surface metal raceway, are not to exceed __________ for access or protection of telecommunications cabling and installation of cable trays and ladder racks in telecommunications service entrance room, spaces, or closets.
Correct Answer
B. 10 feet
Explanation
Incidental short sections of circular or surface metal raceway are not to exceed 10 feet for access or protection of telecommunications cabling and installation of cable trays and ladder racks in telecommunications service entrance room, spaces, or closets.
23.
In WAC 296-46B-908, the person identified as the installer on the Class B Label is responsible for posting the label in a conspicuous permanent manner, at the__________?
Correct Answer
A. Main Service-Feeder Location/ Branch Circuit Panel Board
Explanation
According to WAC 296-46B-908, the person identified as the installer on the Class B Label is responsible for posting the label in a conspicuous permanent manner at the Main Service-Feeder Location/ Branch Circuit Panel Board. This means that the label should be placed in a visible and permanent location at the main service or branch circuit panel board. The label is important for identifying the installer and providing information about the electrical system, so it should be easily accessible for anyone who needs to refer to it.
24.
New septic tanks containing electrical wires and equipment do not have to be inspected and approved prior to being loaded with sewage?
Correct Answer
B. False
Explanation
New septic tanks containing electrical wires and equipment must be inspected and approved prior to being loaded with sewage. This is necessary to ensure that the tanks are safe and compliant with regulations. Failure to inspect and approve these tanks could lead to potential hazards and risks. Therefore, the correct answer is False.
25.
After recieving a certificate of competency and it is placed in inactive status, you are required to retest after 90 days.
Correct Answer
A. True
Explanation
After receiving a certificate of competency and placing it in inactive status, it is necessary to retest after 90 days. This implies that the certificate becomes invalid after a certain period of inactivity and requires retesting to ensure competency is maintained.
26.
Telecommunications trainee's may recieve credit towards recieving their 06 limited energy license if verified by an electrical contractor?
Correct Answer
B. False
Explanation
Telecommunications trainees may not receive credit towards receiving their 06 limited energy license if verified by an electrical contractor.
27.
Limited Energy trainee's may recieve credit towards recieving their Telecommunication's license if verified by an electrical contractor?
Correct Answer
A. True
Explanation
Trainees in the Limited Energy field may receive credit towards obtaining their Telecommunications license if their experience is verified by an electrical contractor. This means that their previous work or training in Limited Energy may be recognized and counted towards the requirements for obtaining a Telecommunications license.
28.
Continuing education class attendance will only be verified based on the ____________ provided by the sponsor.
Correct Answer
A. Completion Roster
Explanation
Attendance for continuing education classes can be verified by using a completion roster. This roster is typically provided by the sponsor of the class and lists the names of the participants who have successfully completed the course. By checking this roster, the sponsor can confirm whether or not an individual attended the class and completed the necessary requirements.
29.
What is the ratio for electrical trainees to electricians if they are in training school?
Correct Answer
A. 1:1
Explanation
In the training school for electrical trainees, the ratio of trainees to electricians is 1:1. This means that for every trainee, there is one electrician. This ratio suggests that the training program aims to provide individual attention and guidance to each trainee, ensuring a comprehensive learning experience.
30.
Scope of work is covered by______________
Correct Answer
C. WAC 296-46B
Explanation
The scope of work related to electrical installations and inspections in Washington State is covered by WAC 296-46B, which includes detailed regulations for electrical work. RCW 19.28 also deals with electrical laws and standards but WAC 296-46B specifically outlines the scope of work for electricians and related trades under Washington State law.
31.
If caught giving a false statement on an experience of affidavit the department may subtract 2000 hours for work experience?
Correct Answer
A. True
Explanation
If someone is caught giving a false statement on an experience affidavit, it is likely that the department will subtract 2000 hours from their claimed work experience. This suggests that providing false information on an affidavit can have serious consequences and may result in a significant reduction in the individual's work experience.
32.
The department may not take away your certificate of competency at any given time?
Correct Answer
B. False
Explanation
The department has the authority to take away your certificate of competency at any given time.
33.
The permit holder is responsible to find all applicable permits required by the department when requested?
Correct Answer
A. True
Explanation
The statement suggests that the responsibility of finding all applicable permits required by the department lies with the permit holder when requested. This implies that it is the permit holder's duty to identify and obtain the necessary permits as and when required by the department. Therefore, the answer "True" indicates that the statement is correct, and the permit holder is indeed responsible for finding all applicable permits when requested.
34.
What is the ratio for limited energy specialty electrician trainees to certified master specialty electricians?
Correct Answer
B. 1:2
Explanation
The ratio of limited energy specialty electrician trainees to certified master specialty electricians is 1:2. This means that for every one limited energy specialty electrician trainee, there are two certified master specialty electricians.
35.
It is required that a specialty electrician must be on the same job site as the non-certified individual for a minimum of ________ of each working day.
Correct Answer
D. Seventy five percent
Explanation
A specialty electrician must be present on the job site for at least 75% of each working day. This means that the electrician must be physically present and actively working for the majority of the time. This requirement ensures that there is a qualified and certified individual overseeing the electrical work and maintaining safety standards.
36.
Upon request, electrical inspections will be made by the department within____________ excluding holidays, Saturdays, and Sundays.
Correct Answer
A. Fourty-eight hours
Explanation
Upon request, the department will conduct electrical inspections within a time frame of forty-eight hours, excluding holidays, Saturdays, and Sundays. This means that when someone requests an electrical inspection, the department will aim to complete it within two days, as long as it does not fall on a holiday or weekend.
37.
_____________has the right during reasonable hours to enter into and upon any building or premises for the purpose of making any inspection or test of the installation of new construction or altered electrical wiring.
Correct Answer
A. The Director
Explanation
The Director has the right during reasonable hours to enter into and upon any building or premises for the purpose of making any inspection or test of the installation of new construction or altered electrical wiring. This suggests that the Director is the authority figure responsible for overseeing and ensuring the compliance and safety of electrical installations in buildings or premises. They have the power to conduct inspections and tests to ensure that the electrical wiring meets the required standards and regulations.
38.
"Telecommunications horizontal cabling systems" means the portions of the telecommunications cabling system that extends from the work area telecommunications outlet or connector to the telecommunications closet.
Correct Answer
A. True
Explanation
The statement is true because "telecommunications horizontal cabling systems" refers to the sections of the cabling system that connect the work area telecommunications outlet or connector to the telecommunications closet. This means that it includes the cables and connectors that are used to transmit data and communication signals within a building or facility.
39.
Device and junction boxes for fire alarm systems other than the surface raceway type, must be substantially________ in color, both inside and outside.
Correct Answer
A. Red
Explanation
Device and junction boxes for fire alarm systems must be substantially red in color, both inside and outside. This is because the color red is commonly associated with fire and emergencies, making it easily recognizable and indicating the presence of a fire alarm system. Using a different color could cause confusion and make it difficult to identify the purpose of the boxes in case of an emergency. Therefore, it is important for these boxes to be red to ensure clear visibility and understanding.
40.
The accreditation of an NRTL OSHA national approved equipment will be recognized by the state of Washington?
Correct Answer
A. True
Explanation
The accreditation of an NRTL (Nationally Recognized Testing Laboratory) OSHA (Occupational Safety and Health Administration) approved equipment will be recognized by the state of Washington. This means that if a piece of equipment has been approved by an NRTL and meets the necessary OSHA standards, it will be accepted and recognized as safe by the state of Washington.