Randomized and graded questions from the study guide.
35 feet
40 feet
Three stories
Four stories
Rate this question:
Specified in the code.
Applicable to unique conditions.
Specifically adopted.
Relevant to fire or life safety.
Rate this question:
General
Specific
Least restrictive
Most restrictive
Rate this question:
Building official
Code official
Code administrator
Chief building inspector
Rate this question:
Ignore
Waive
Violate
Interpret
Rate this question:
They meet the requirements for new materials.
They are limited to 10% of the total materials.
Used materials may never be used in construction.
A representative sampling is tested for compliance.
Rate this question:
For only those issues not affecting life safety or fire safety.
For individual cases where the strict letter of the code is impractical.
Where the intent and purpose of the code cannot be met.
Related only to administrative functions.
Rate this question:
Durability
Economics
Strength
Fire resistance
Rate this question:
The owner
The contractor
An approved agency
A design professional
Rate this question:
100
120
150
200
Rate this question:
5 feet, 0 inches
5 feet, 6 inches
5 feet, 9 inches
6 feet, 0 inches
Rate this question:
Any framing work above the lowest floor level
Approval of the framing inspection
The final inspection
Issuance of the certification of occupancy
Rate this question:
At the job site
By the permit applicant
By the contractor
In your wallet
Rate this question:
"Approved for Construction"
"Conditional Approval"
"Accepted as Reviewed"
"Reviewed for Code Compliance"
Rate this question:
90 days
180 days
1 year
2 years
Rate this question:
Footing inspection
Frame inspection
Soil classification
Energy efficiency inspection
Rate this question:
The permit holder
Kate should do it
The contractor
The owner
Rate this question:
The name of the building owner
The name of the building official
The building's type of construction
The building's maximum height and area
Rate this question:
30 days
180 days
4 weeks
A period of time set by the building official
Rate this question:
The provisions of the code do not fully comply
A code requirement should be waived
The rules have been incorrectly interpreted
A better form of construction is provided
Rate this question:
One
Two
Three
Four
Rate this question:
International Building Code Chapter 1
International Building Code Chapter 34
International Existing Building Code
International Property Maintenance Code
Rate this question:
International Building Code
Referenced standard
The more restrictive of the International Building Code or the referenced standard
The provision as determined by the building official
Rate this question:
5
7
6
8
Rate this question:
Structural concrete
Light-framed wood construction
Structural steel buildings
Exterior gypsum sheathing installation
Rate this question:
18 inches; 4,000 gallons
24 inches; 5,000 gallons
18 inches; 57 mimosas
36 inches; 6,000 gallons
Rate this question:
30
32
62
54
Rate this question:
Where it is issued in error
On the basis of incomplete information
Where issued in violation of a jurisdictional ordinance
Where other permits by the contractor have been voided
Rate this question:
90 days
180 days
Until the contractor's birthday
1 year
Rate this question:
A shear assembly only
A fire-resistance-rated assembly only
Either a fire- or smoke-resistant assembly
Either a shear or fire-resistance-rated assembly
Rate this question:
5, 1
10, 1
5, 1-1/2
10, 1-1/2
Rate this question:
F-1
I-1
R-2
R-3
Rate this question:
Owner
Building official
General contractor
Neighborhood association
Rate this question:
Owner
Contractor
Permit applicant
Design professional
Rate this question:
Owner of the property involved
Owner's agent
Permit holder
Person doing the work
Rate this question:
A
B
I
R
Rate this question:
A
M
S
U
Rate this question:
100
150
200
300
Rate this question:
120
399
749
999
Rate this question:
No separation is required (considered same occupancy)
1-hour fire barrier
2-hour fire barrier
One full arm's length away
Rate this question:
Restaurant with dance floor
School library
Outdoor football stadium
Indoor hockey arena
Rate this question:
Convenience store
Motor vehicle showroom
Car wash
College classroom building
Rate this question:
A-2
A-3
M
Z
Rate this question:
H-1
H-2
H-4
H-5
Rate this question:
Group H-1
Group H-2
Group H-3
Group H-5
Rate this question:
E
I-1
I-2
R-4
Rate this question:
15
30
60
120
Rate this question:
I-1
I-4
R-3
R-4
Rate this question:
Wholesale store
Sales room
Motor vehicle showroom
Motor vehicle service station
Rate this question:
R-1
R-2
R-4
B-2
Rate this question:
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.