2A651 Volume 1 (Q21-37) Unit 2

Approved & Edited by ProProfs Editorial Team
The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Vison
V
Vison
Community Contributor
Quizzes Created: 9 | Total Attempts: 1,878
Questions: 17 | Attempts: 128

SettingsSettingsSettings
2A651 Volume 1 (Q21-37) Unit 2 - Quiz


Good accurate practice test volume 1 cdc


Questions and Answers
  • 1. 

    A  specialized function of the supply mission is

    • A.

      Retrieval.

    • B.

      Repair.

    • C.

      Disposal.

    Correct Answer
    C. Disposal.
    Explanation
    The correct answer is disposal. In a supply mission, disposal refers to the process of getting rid of or eliminating waste, excess materials, or unwanted items. This specialized function ensures that any unnecessary or expired supplies are properly discarded to maintain a clean and organized environment. Retrieval, on the other hand, pertains to the act of recovering or obtaining items. Repair involves fixing or restoring damaged items.

    Rate this question:

  • 2. 

    From what perspective does the RSS manage supply?

    • A.

      Geographical system.

    • B.

      Weapons system.

    • C.

      Base system

    Correct Answer
    B. Weapons system.
    Explanation
    The correct answer is "Weapons system." This suggests that the RSS manages supply from the perspective of a weapons system. This implies that the focus of supply management is on providing and managing the necessary weapons and equipment for a particular purpose or objective. It suggests that the RSS is responsible for ensuring the availability, distribution, and maintenance of weapons and related resources to support military operations or defense strategies.

    Rate this question:

  • 3. 

    Which Base Supply function manages the repair cycle system ?

    • A.

      Standard Base Supply System.

    • B.

      Depot Leval Repair System.

    • C.

      Repair Cycle Support System.

    Correct Answer
    C. Repair Cycle Support System.
    Explanation
    The Repair Cycle Support System manages the repair cycle system. This system is responsible for coordinating and managing the repair and maintenance of equipment and supplies. It ensures that repairs are done efficiently and in a timely manner, minimizing downtime and maximizing operational readiness. The Repair Cycle Support System plays a crucial role in maintaining the functionality and availability of equipment within the base supply system.

    Rate this question:

  • 4. 

    Selected equipment items,when returned to depot because of their design characteristics function or application,are predetermined to require.

    • A.

      Overhaul.

    • B.

      Time change.

    • C.

      Repair cycle support.

    Correct Answer
    A. Overhaul.
    Explanation
    The selected equipment items are predetermined to require overhaul when returned to the depot due to their design characteristics, function, or application. Overhaul is a comprehensive maintenance process that involves disassembling, inspecting, repairing, and reassembling the equipment to ensure its optimal performance and extend its lifespan. This is necessary because the equipment's design, function, or application may cause wear and tear or damage that can only be addressed through a thorough overhaul.

    Rate this question:

  • 5. 

    Which suply document provides a means for organizations to review all document numbers processed during the day by the SBSS?

    • A.

      Daily Document Register (D04)

    • B.

      Priority Monitor Report (D18).

    • C.

      Due -out Validation Listing (m30).

    Correct Answer
    A. Daily Document Register (D04)
    Explanation
    The Daily Document Register (D04) provides a means for organizations to review all document numbers processed during the day by the SBSS. This register allows organizations to keep track of all the documents that have been processed, ensuring that no document is missed or overlooked. It serves as a reference for organizations to review and verify the document numbers processed, helping them maintain accurate and up-to-date records of their document processing activities.

    Rate this question:

  • 6. 

    Base Supply must deliver numerous parts to numerous organizations on a prioritized basis becaause of what difference in each organization?

    • A.

      Location.

    • B.

      Mission.

    • C.

      Type of aircraft.

    Correct Answer
    B. Mission.
    Explanation
    Each organization has a different mission or objective that they are trying to achieve. Therefore, Base Supply must prioritize the delivery of parts based on the specific mission of each organization. The parts needed for a mission-critical aircraft will take precedence over those needed for a non-essential aircraft. By considering the mission of each organization, Base Supply can ensure that the parts are delivered in a way that supports the overall goals and objectives of each organization.

    Rate this question:

  • 7. 

    What does a completed AFTO Form 350 serve to identify?

    • A.

      How long the item will take to repair.

    • B.

      Why the item broke.

    • C.

      Origin of an item.

    Correct Answer
    C. Origin of an item.
    Explanation
    A completed AFTO Form 350 serves to identify the origin of an item. It provides information about where the item came from or was manufactured. This form is typically used in the military to track and document the history and origin of equipment or parts. It helps in maintaining a record of the source of the item, which can be useful for maintenance, repairs, and accountability purposes.

    Rate this question:

  • 8. 

    Which provides a block-by-block explanation of how to document the AFTO Form 350 taf?

    • A.

      AFMAN 23-110.

    • B.

      To 00-5-1.

    • C.

      TO 00-20-2

    Correct Answer
    C. TO 00-20-2
    Explanation
    The correct answer is TO 00-20-2. This document provides a block-by-block explanation of how to document the AFTO Form 350 taf.

    Rate this question:

  • 9. 

    If you are TDY and IMDS and SBSS are not available,what form would you use to order an engine part?

    • A.

      AF IMT 2005.

    • B.

      DD Form 1574.

    • C.

      AFTO Form 350

    Correct Answer
    A. AF IMT 2005.
    Explanation
    If you are TDY (Temporary Duty) and the systems IMDS (Integrated Maintenance Data System) and SBSS (Standard Base Supply System) are not available, you would use AF IMT 2005 to order an engine part. This form is used for requesting and tracking materials and services when other systems are not accessible. It allows personnel to provide necessary information for the procurement and delivery of the required part.

    Rate this question:

  • 10. 

    If you need detailed information concerning the AF IMT 2005 codes and entries,refer to AFMAN

    • A.

      23-254.

    • B.

      23-110.

    • C.

      91-110.

    Correct Answer
    B. 23-110.
  • 11. 

    Which form is attached to items that are awaiting parts or maintenance?

    • A.

      DD Form 1574.

    • B.

      DD Form 1577-3

    • C.

      DD Form 1575.

    Correct Answer
    C. DD Form 1575.
    Explanation
    DD Form 1575 is the correct answer because it is the form that is attached to items that are awaiting parts or maintenance. This form is used to track and document the status of the items and ensure that they are properly accounted for during the maintenance process. DD Form 1574 is used for documenting serviceable equipment, while DD Form 1577-3 is used for documenting unserviceable equipment.

    Rate this question:

  • 12. 

    Which item is one that a storage time period must be assigned to ensure that it will perform satisfactorily over a specified period of time?

    • A.

      Shelf-life.

    • B.

      Inspection.

    • C.

      Supply.

    Correct Answer
    A. Shelf-life.
    Explanation
    Shelf-life refers to the period during which a product can be stored and maintain its quality and safety. By assigning a storage time period to an item, particularly perishable goods, it ensures that the item will be consumed or used before it reaches its expiration date. This helps to ensure that the item will perform satisfactorily over the specified period of time, without any deterioration or loss of quality. Inspection and supply are not directly related to the storage time period of an item.

    Rate this question:

  • 13. 

    When a bench stock item has a type I shelf -life ,it means the item

    • A.

      Should be inspected or tested.

    • B.

      Has a definite non-extendible period of shelf-life.

    • C.

      Should be returned to supply after expiration date.

    Correct Answer
    B. Has a definite non-extendible period of shelf-life.
    Explanation
    When a bench stock item has a type I shelf-life, it means that the item has a definite non-extendible period of shelf-life. This means that the item can only be used or stored for a specific period of time before it expires and becomes unusable. It is important to adhere to the expiration date and not attempt to extend the shelf-life of the item.

    Rate this question:

  • 14. 

    A Category I Dr is used to report a deficiency

    • A.

      That,if uncorrected,will cause major loss or damage to equipment or a system.

    • B.

      That is required for tracking by agreement of the single manager.

    • C.

      Found during an initial acceptance inspection

    Correct Answer
    A. That,if uncorrected,will cause major loss or damage to equipment or a system.
    Explanation
    The correct answer is "that, if uncorrected, will cause major loss or damage to equipment or a system." This option explains the purpose of using a Category I Dr, which is to report a deficiency that, if left uncorrected, could result in significant loss or damage to equipment or a system. This suggests that Category I Drs are reserved for serious issues that require immediate attention and corrective action to prevent any major consequences.

    Rate this question:

  • 15. 

    Within how many hours must Category I DR be forwarded to the screening point?

    • A.

      24

    • B.

      12

    • C.

      8

    Correct Answer
    A. 24
    Explanation
    Category I DR must be forwarded to the screening point within 24 hours. This ensures that any potential security threats or dangerous items are identified and addressed promptly. It allows the necessary measures to be taken to ensure the safety and security of the area. Failing to forward Category I DR within this time frame could result in delays or compromised security protocols. Therefore, it is crucial to adhere to this time requirement.

    Rate this question:

  • 16. 

    Which type of items must be reflected on the CA?CRL?

    • A.

      Blue jacets

    • B.

      Bench Stock

    • C.

      Equipment Authorization Inventory Data.

    Correct Answer
    C. Equipment Authorization Inventory Data.
    Explanation
    The correct answer is Equipment Authorization Inventory Data. This is because the CA/CRL (Central Authority/Central Repository for the International Carriage of Dangerous Goods by Road) is responsible for maintaining a database of equipment authorized for use in the transportation of dangerous goods by road. Therefore, the Equipment Authorization Inventory Data must be reflected on the CA/CRL to ensure compliance and safety in the transportation of dangerous goods.

    Rate this question:

  • 17. 

    To become an equipment custodian,you must be appointed by the

    • A.

      Supervisor

    • B.

      Commander

    • C.

      The shop supervisor

    Correct Answer
    B. Commander
    Explanation
    To become an equipment custodian, one must be appointed by the commander. This suggests that the commander holds the authority to appoint individuals to this role. The commander is likely responsible for overseeing the equipment and ensuring that it is properly managed and maintained. By appointing a custodian, the commander can delegate this responsibility to someone who can effectively handle the task.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • May 13, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Nov 05, 2010
    Quiz Created by
    Vison
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.