1.
When preparing an issue request, which copy of what form is used by the point of submission as a control register for determining the next available document serial number?
Correct Answer
C. Copy 2 of AF Form 2005
Explanation
Copy 2 of AF Form 2005 is used as a control register for determining the next available document serial number when preparing an issue request.
2.
What one position alpha code is used to indicate how the Material Management System accumulates demand data for stock leveling and due in from maintenance (DIFM) control?
Correct Answer
A. Demand code
Explanation
The correct answer is "Demand code". A demand code is used in the Material Management System to indicate how demand data for stock leveling and due in from maintenance (DIFM) control is accumulated. It helps in managing inventory and ensuring that the right amount of stock is available based on demand.
3.
Organizations may identify their issue requests to Base Supply using either a
Correct Answer
D. Stock number or part number
Explanation
Organizations can submit their issue requests to Base Supply by using either a stock number or a part number. The stock number refers to the unique identifier assigned to a specific item in the inventory, while the part number is a manufacturer's identification number for a particular component or product. By accepting both stock and part numbers, Base Supply allows organizations to easily communicate their needs and ensure that the correct items are provided in a timely manner.
4.
Which management notice is a result of issue processing and reflects issue, kill or backorder quantity status
Correct Answer
A. I004
5.
An I007 management notice will be produced when a
Correct Answer
B. Part number request cannot be converted to a stock number under program control
6.
What Material Management System output notifies the core automated maintenance system (CAMS) of changes in due-out status?
Correct Answer
B. 1SH
Explanation
The correct answer is 1SH. The 1SH output in the Material Management System notifies the core automated maintenance system (CAMS) of changes in due-out status.
7.
Which organization contacts sources of supply directly to obtain status, laterial support, or other assistance?
Correct Answer
D. LSC
Explanation
LSC stands for Logistics Support Cell. This organization contacts sources of supply directly to obtain status, lateral support, or other assistance. They are responsible for coordinating and managing logistics operations, including procurement and supply chain management.
8.
Who is responsible for ensureing that all local resources are exhausted prior to submitting a mission capability (MICAP) requisition to the source of supply?
Correct Answer
D. Both Material Management and Maintenance
Explanation
Both Material Management and Maintenance are responsible for ensuring that all local resources are exhausted prior to submitting a mission capability (MICAP) requisition to the source of supply. Material Management is responsible for managing and controlling the inventory and supply chain, while Maintenance is responsible for utilizing and maintaining the local resources effectively. By working together, they can ensure that all available resources are used before requesting additional support from the source of supply.
9.
What code on the mission capability (MICAP) report (DIC B9x) identifies the reason for the out-of-stock condition that existed at the time of the MICAP requisition?
Correct Answer
D. Cause
Explanation
The code on the MICAP report that identifies the reason for the out-of-stock condition is "Cause". This code is used to indicate the specific cause or reason for the shortage or unavailability of the item at the time of the MICAP requisition. It helps in providing information about the underlying issue that led to the out-of-stock condition, allowing for better analysis and resolution of the problem.
10.
What core automated maintenance system (CAMS) data screen is used to reconcile the maintenance ststus of a mission capability (MICAP) requirement?
Correct Answer
D. 731
11.
What code found on the mission capability (MICAP) report (DIC B9x) identifies the reason for termination of the MICAP condition?
Correct Answer
C. Delete code
Explanation
The code found on the MICAP report that identifies the reason for termination of the MICAP condition is the "Delete code". This code is used to indicate that the MICAP condition has been resolved or terminated and is no longer applicable. It serves as a way to track the status of the MICAP condition and communicate the outcome of the situation.
12.
Which report is transmitted to the applicable source of supply to report the initiation, termination, or change to a mission capability (MICAP) condition?
Correct Answer
B. MICAP report (B9*)
Explanation
The correct answer is MICAP report (B9*). This report is transmitted to the applicable source of supply to report the initiation, termination, or change to a mission capability (MICAP) condition. It is used to notify the supply system of any issues or changes that may affect the mission capability of a particular item or system.
13.
Y-type details are internally established and maintained in the supply computer for how many days after a mission capability (MICAP) termination?
Correct Answer
D. 90
Explanation
Y-type details are internally established and maintained in the supply computer for 90 days after a mission capability (MICAP) termination. This means that the supply computer keeps track of the Y-type details for a period of 90 days after the termination of a MICAP. This information is important for inventory management and tracking purposes, ensuring that the necessary supplies are available when needed.
14.
After how many days of computer downtime must manual mission capability (MICAP) reporting be accomplished for MICAP incidents?
Correct Answer
D. 1
Explanation
Manual mission capability (MICAP) reporting must be accomplished for MICAP incidents after 1 day of computer downtime.
15.
Which due-in from maintenance (DIFM) detail record indicates an issue to Maintenance?
Correct Answer
B. Firm
Explanation
The correct answer is "Firm." In the context of a due-in from maintenance (DIFM) detail record, the term "Firm" indicates that there is a confirmed issue or problem that needs to be addressed by the maintenance department. This could refer to a malfunctioning equipment or a request for repairs or maintenance. The term "Firm" suggests that the issue is significant and requires immediate attention.
16.
Which listing is used to perform the due-in from maintenance (difm) reconciliation?
Correct Answer
C. D23
17.
Which listing is an important tool for monitoring status and maintaining visibility of due in from maintenance (DIFM) assets?
Correct Answer
C. D23
Explanation
D23 is the correct answer because it is the listing that is an important tool for monitoring status and maintaining visibility of due in from maintenance (DIFM) assets. This listing likely contains information about the assets that are due in from maintenance, allowing for easy tracking and monitoring of their status.
18.
How many copies of the AF Form 2005, Turn-in Request, are required for turn-in preparation?
Correct Answer
C. Three
Explanation
Three copies of the AF Form 2005, Turn-in Request, are required for turn-in preparation. This is necessary to ensure that all necessary documentation is properly completed and distributed to the appropriate parties. Having three copies allows for one copy to be retained by the turn-in organization, one copy to be sent to the supply organization, and one copy to be kept by the unit for their records.
19.
Which action taken code indicates an item is not authorized base level repair?
Correct Answer
B. 1
20.
What term is used to describe selected XD items that are candidates for two-level repair?
Correct Answer
D. Depot-level reparables
Explanation
Depot-level reparables is the correct answer because it refers to selected XD items that are candidates for two-level repair. Depot-level reparables are items that require repair at a specialized repair facility, known as a depot, rather than at the unit or shop level. These items are typically more complex and require specialized equipment and expertise for repair.
21.
What is the source of data Supply uses to process turnaround transactions?
Correct Answer
D. ATFO Form 350
Explanation
The correct answer is ATFO Form 350. This form is the source of data that Supply uses to process turnaround transactions.
22.
What TRIC is not an option for processing after disposition instructions for an unservicable asset has been received?
Correct Answer
A. ISU
Explanation
ISU, which stands for Inventory Storage and Utilization, is not an option for processing after disposition instructions for an unserviceable asset has been received. ISU is primarily used for storing and utilizing inventory, not for processing unserviceable assets. TRM, MSI, and SHP are other options that may be used for processing unserviceable assets after disposition instructions have been received.
23.
Which input is used for initial stockage and replenishment of a supply point?
Correct Answer
B. ISU
Explanation
ISU is the correct answer because it stands for Initial Stockage and Replenishment Unit. This input is used for the initial stockage and replenishment of a supply point, meaning it is the starting point for stocking and restocking supplies at a specific location.
24.
Mobility readiness spares package (MSRP) assets are designed to allow support of a weapon system in a deployed location for how many days before resupply is necessary?
Correct Answer
B. 60
Explanation
MSRP assets are designed to support a weapon system in a deployed location for 60 days before resupply is necessary. This means that these assets are intended to provide the necessary resources and equipment for a weapon system to operate autonomously for a period of two months without requiring additional supplies or support.
25.
What transaction identification code (TRIC) is used to load the serial/number control record for RSP authorizations?
Correct Answer
C. IEB
Explanation
The correct answer is IEB. The IEB transaction identification code is used to load the serial/number control record for RSP authorizations.
26.
What program is used to perform the readiness spares package (RSP) reconciliation?
Correct Answer
B. S05
Explanation
The program used to perform the readiness spares package (RSP) reconciliation is S05.
27.
What transaction identification code (TRIC) is used to issue assetes from a mobility readiness spares package (MSRP) to the user?
Correct Answer
B. MSI
Explanation
The correct answer is MSI. The question is asking for the transaction identification code (TRIC) used to issue assets from a mobility readiness spares package (MSRP) to the user. Among the given options, MSI is the only TRIC that fits this scenario.
28.
The decision to transfer Mobility readiness spares package (MRSP) rests with the host and the?
Correct Answer
C. Gaining MAJCOM
Explanation
The decision to transfer Mobility readiness spares package (MRSP) rests with the gaining MAJCOM. This means that the responsibility for determining whether or not to transfer the MRSP lies with the Major Command that is receiving the package. They are responsible for assessing their own needs and determining if the transfer is necessary or beneficial.
29.
Mobility readiness spares package (MRSP) will be inventoried within how many days after return from deployment?
Correct Answer
C. 10
30.
For long-term deployments, what input transfers accountability of selected equipment items?
Correct Answer
B. 1ET/FME
Explanation
The input that transfers accountability of selected equipment items for long-term deployments is 1ET/FME.
31.
Deployments are considered long-term after how many days?
Correct Answer
B. 120
Explanation
Deployments are considered long-term after 120 days because this time frame is generally considered to be a significant period for a deployment to be considered as a long-term commitment. It allows for sufficient time for the deployment to have a lasting impact and for individuals to adjust to the new environment and responsibilities.
32.
What wartime capability system is used to conduct wartime assessments?
Correct Answer
D. PC-Aircraft Sustainability Model (PC-ASM)
Explanation
The PC-Aircraft Sustainability Model (PC-ASM) is the correct answer because it specifically focuses on assessing the sustainability of aircraft during wartime. This capability system is designed to evaluate the ability of aircraft to sustain operations and remain functional in a wartime environment. It takes into account factors such as maintenance, logistics, and resource availability to provide a comprehensive assessment of the aircraft's sustainability.
33.
What support Aircraft Sustainability Model (ASM) is used to calculate the number of spare parts for other than wartime?
Correct Answer
B. Peacetime and combind support
Explanation
The support Aircraft Sustainability Model (ASM) is used to calculate the number of spare parts during peacetime and combined support operations. This model takes into account the specific requirements and demands of maintaining aircraft in non-wartime situations, ensuring that an adequate number of spare parts are available to support ongoing operations and maintenance activities. By considering both peacetime and combined support scenarios, the ASM helps to optimize logistics and sustainment efforts, ensuring the readiness and availability of aircraft for various operational needs.
34.
Who is responsible to select the method for document distribution and creation?
Correct Answer
A. Team Chief
Explanation
The Team Chief is responsible for selecting the method for document distribution and creation. As the leader of the team, they have the authority and knowledge to determine the most suitable method based on the team's needs and requirements. They are accountable for ensuring that the document is created and distributed effectively, and they have the authority to make decisions regarding this process.
35.
To account for all transactions during degraded operation, the proper paperwork must be filled out and maintained until input into the
Correct Answer
B. Material Management System
Explanation
The Material Management System is the correct answer because it is responsible for managing and tracking all transactions related to materials and inventory. During degraded operation, it is important to fill out proper paperwork and maintain it until it can be input into the Material Management System to ensure accurate record-keeping and accountability for all transactions. The other options, such as the Contingency Processing System, PC-ASM, and INSMART, are not specifically designed for managing material transactions and therefore would not be the appropriate choice in this context.
36.
What system captures UTC assessments, identifies suitable UTCs to satisfy taskings, and help forecast shortfalls
Correct Answer
C. AEF Reporting Tool (ART)
Explanation
The AEF Reporting Tool (ART) captures UTC assessments, identifies suitable UTCs to satisfy taskings, and helps forecast shortfalls. It is a system that provides a comprehensive overview of Air Expeditionary Force (AEF) capabilities and resources. By using ART, the Air Force can effectively manage and allocate resources to meet mission requirements and ensure operational readiness.
37.
What code reflected in the operations plan (OPlan) or time phased force deployment data (TPFDD) defines the number of passengers and amount of cargo that must be moved to meet a wartime tasking?
Correct Answer
D. Unit type code (UTC)
Explanation
The correct answer is Unit type code (UTC). The Unit type code (UTC) is a code that is used to identify the type of military unit and its capabilities. In the context of the operations plan (OPlan) or time phased force deployment data (TPFDD), the UTC is used to determine the number of passengers and amount of cargo that need to be moved in order to fulfill a wartime tasking. The UTC provides specific information about the unit's composition and equipment, allowing for accurate planning and allocation of resources for transportation.
38.
What information must be annotated on all documentation for small arms?
Correct Answer
C. Serial number
Explanation
All documentation for small arms must include the serial number. This unique identifier is crucial for tracking and identifying individual firearms. It helps in maintaining accurate records, ensuring accountability, and facilitating investigations if the need arises. The serial number is often engraved or stamped on the firearm and is an essential piece of information that must be annotated on all documentation to maintain proper documentation and traceability.
39.
Which type mobility (MOBAG) bag contains chemical warfare defense equipment?
Correct Answer
C. C
Explanation
The correct answer is C because it is stated that this type of mobility bag contains chemical warfare defense equipment.
40.
Mobility bags (MOBAGS) can be built ahead of time and stored using what concept?
Correct Answer
A. Tariff-sizing
Explanation
Mobility bags can be built ahead of time and stored using the concept of tariff-sizing. Tariff-sizing refers to the process of determining the appropriate size or quantity of items to be stored or transported based on a predetermined tariff or rate. In the context of mobility bags, tariff-sizing helps in determining the optimal number and size of bags to be built and stored in order to efficiently meet the mobility needs and requirements.