Examen Del Curso

Approved & Edited by ProProfs Editorial Team
The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By David Arteaga
David Arteaga, CCMI, Kanban
David is a seasoned professional, excelling in process management, software development, and consultancy. He expert in CMMI, Scrum, and Kanban across 16 countries and proficient in Jira software and Service Desk.
Quizzes Created: 1 | Total Attempts: 647
Questions: 20 | Attempts: 647

SettingsSettingsSettings
Examen Del Curso - Quiz


Questions and Answers
  • 1. 

    ¿Cuáles de las siguientes áreas de proceso son del Nivel de Madurez 4?

    • A.

      Gestión Cuantitativa de Proyecto (QPM)

    • B.

      Análisis Causal y Solución (CAR)

    • C.

      Gestión del Desempeño Organizacional (OPM)

    • D.

      Desempeño del Proceso Organizacional (OPP)

    Correct Answer(s)
    A. Gestión Cuantitativa de Proyecto (QPM)
    D. Desempeño del Proceso Organizacional (OPP)
    Explanation
    The areas of process that are at maturity level 4 are the Quantitative Project Management (QPM) and Organizational Process Performance (OPP). These areas focus on managing and improving the performance of both individual projects and the overall organizational processes. QPM involves using quantitative techniques to understand and control the performance of projects, while OPP focuses on measuring and analyzing the performance of the organization's processes to identify areas for improvement. Both of these areas are important for achieving a higher level of process maturity and ensuring consistent project success.

    Rate this question:

  • 2. 

    ¿Cuál es la diferencia entre Verificación y Validación?

    • A.

      Verificar es asegurar el cumplimiento de los requerimientos mientras que Validación es asegurar que construimos el producto esperado por el usuario

    • B.

      Verificar es hacer revisiones de pares mientras que validar es hacer pruebas de software (testing)

    • C.

      Verificar es más importante y obligatorio mientras que la validación es opcional

    • D.

      Verificar y validar son actividades de control de calidad y tienen como propósito identificar y remover defectos

    Correct Answer
    A. Verificar es asegurar el cumplimiento de los requerimientos mientras que Validación es asegurar que construimos el producto esperado por el usuario
    Explanation
    The explanation for the given correct answer is that verification refers to the process of ensuring that the requirements are met, while validation refers to the process of ensuring that the product built matches the user's expectations. Verification involves checking if the system meets the specified requirements, while validation involves testing the system to ensure it functions as intended by the user. Both verification and validation are activities related to quality control and aim to identify and remove defects.

    Rate this question:

  • 3. 

    ¿Cuáles de las siguientes áres de proceso están en el nivel de madurez 1

    • A.

      Planificación de Proyecto (PP)

    • B.

      Control y Monitorización de Proyecto (PMC)

    • C.

      Gestión de Requerimientos (REQM)

    • D.

      El nivel de madurez 1 no tiene áreas de proceso

    • E.

      Ninguna de las anteriores

    Correct Answer
    D. El nivel de madurez 1 no tiene áreas de proceso
    Explanation
    The correct answer states that the level of maturity 1 does not have any process areas. This means that none of the given options (Planificación de Proyecto, Control y Monitorización de Proyecto, Gestión de Requerimientos) are at maturity level 1. Therefore, the answer "El nivel de madurez 1 no tiene áreas de proceso" is correct.

    Rate this question:

  • 4. 

    ¿Cuál de las siguientes declaraciones es verdadera?

    • A.

      El nivel de madurez 3 tiene 11 áreas de proceso

    • B.

      Para implementar el nivel de madurez 3 hay que implementar 18 áreas de proceso

    • C.

      No se puede implementar el nivel de madurez 3 sin implementar también el nivel de madurez 2

    Correct Answer(s)
    A. El nivel de madurez 3 tiene 11 áreas de proceso
    B. Para implementar el nivel de madurez 3 hay que implementar 18 áreas de proceso
    C. No se puede implementar el nivel de madurez 3 sin implementar también el nivel de madurez 2
    Explanation
    The correct answer is: El nivel de madurez 3 tiene 11 áreas de proceso, Para implementar el nivel de madurez 3 hay que implementar 18 áreas de proceso, No se puede implementar el nivel de madurez 3 sin implementar también el nivel de madurez 2.

    The explanation for this answer is that the Level 3 maturity in the Capability Maturity Model Integration (CMMI) framework consists of 11 process areas. However, in order to implement Level 3, it is necessary to also implement the 18 process areas required for Level 2. This means that Level 3 cannot be implemented without first implementing Level 2.

    Rate this question:

  • 5. 

    ¿Cuáles de los siguientes no son componentes del modelo CMMI?

    • A.

      Prácticas

    • B.

      Sub-prácticas

    • C.

      Metas (goals)

    • D.

      Indicadores

    • E.

      áreas de proceso

    • F.

      Procesos

    Correct Answer(s)
    D. Indicadores
    F. Procesos
    Explanation
    The correct answer is indicadores, procesos. Indicadores (indicators) and procesos (processes) are components of the CMMI model. The other options, prácticas (practices), sub-prácticas (sub-practices), metas (goals), and áreas de proceso (process areas), are all components of the CMMI model as well.

    Rate this question:

  • 6. 

    ¿Cuántas áreas de proceso hay que implementar para lograr el nivel de madurez 3?

    • A.

      17

    • B.

      18

    • C.

      17 ó 18

    • D.

      19

    • E.

      18 ó 19

    Correct Answer
    C. 17 ó 18
    Explanation
    To achieve maturity level 3, it is necessary to implement 17 or 18 process areas. The number may vary depending on the specific requirements and goals of the organization. The exact number of process areas to be implemented will depend on factors such as the size of the organization, the complexity of its projects, and the industry in which it operates. The organization should assess its needs and determine which process areas are most relevant to its goals and objectives in order to achieve maturity level 3.

    Rate this question:

  • 7. 

    ¿Cuáles de las siguientes áreas de proceso no pertenecen a la categoría de Soporte (Support)?

    • A.

      Gestión de Configuración (CM)

    • B.

      Desarrollo de Requerimientos (RD)

    • C.

      Medición y Análisis (MA)

    • D.

      Gestión de Requerimientos (REQM)

    • E.

      Validación (VAL)

    • F.

      Aseguramiento de la Calidad de Proceso y producto (PPQA)

    Correct Answer(s)
    B. Desarrollo de Requerimientos (RD)
    D. Gestión de Requerimientos (REQM)
    E. Validación (VAL)
    Explanation
    The correct answer is Desarrollo de Requerimientos (RD), Gestión de Requerimientos (REQM), and Validación (VAL). These areas of process do not belong to the Support category. The Support category includes the areas of Gestión de Configuración (CM), Medición y Análisis (MA), and Aseguramiento de la Calidad de Proceso y producto (PPQA).

    Rate this question:

  • 8. 

    ¿Cuál de las siguientes oraciones es verdadera?

    • A.

      Cada práctica del CMMI debe tener una única evidencia

    • B.

      Las prácticas del CMMI siempre deben ser actividades formales

    • C.

      Algunas prácticas del CMMI se pueden implementar con actividades informales

    Correct Answer
    C. Algunas prácticas del CMMI se pueden implementar con actividades informales
    Explanation
    The correct answer states that "Some CMMI practices can be implemented with informal activities." This means that not all CMMI practices require formal activities and can be carried out in a more casual or informal manner. This suggests that there is flexibility in implementing CMMI practices and organizations can choose to use informal methods for certain practices if they deem it appropriate.

    Rate this question:

  • 9. 

    ¿Cuántas prácticas genéricas tiene la meta genérica GG 2?

    • A.

      8

    • B.

      9

    • C.

      10

    • D.

      11

    • E.

      12

    Correct Answer
    C. 10
    Explanation
    The meta genérica GG 2 tiene 10 prácticas genéricas.

    Rate this question:

  • 10. 

    ¿Cuántas prácticas genéricas hay en la representación continua?

    • A.

      10

    • B.

      11

    • C.

      12

    • D.

      13

    • E.

      14

    Correct Answer
    D. 13
    Explanation
    The correct answer is 13 because the question is asking for the number of generic practices in continuous representation. Since the number of generic practices is not specified, we can assume that there are 13 of them.

    Rate this question:

  • 11. 

    ¿Qué significa un área de proceso básica en relación a un área de proceso avanzada?

    • A.

      Un área de proceso básica es más fácil de implementar

    • B.

      Un área de proceso avanzada está en los niveles de madurez 4 ó 5

    • C.

      Un área de proceso básica debe implementarse antes que aquellas áreas de proceso avanzadas con las cuales guarda mas relación

    • D.

      Las áreas de proceso básicas están en el nivel de madurez 1

    Correct Answer
    C. Un área de proceso básica debe implementarse antes que aquellas áreas de proceso avanzadas con las cuales guarda mas relación
    Explanation
    An area de proceso básica debe implementarse antes que aquellas áreas de proceso avanzadas con las cuales guarda mas relación, significa que es necesario establecer y cumplir los requisitos básicos de una área de proceso antes de poder implementar y alcanzar los niveles más avanzados de madurez. Esto implica que se deben establecer los fundamentos y bases sólidas de una área de proceso básica antes de poder avanzar y expandir en áreas más complejas y especializadas.

    Rate this question:

  • 12. 

    ¿Cuántas áreas de proceso tiene el modelo CMMI para Desarrollo?

    • A.

      20

    • B.

      21

    • C.

      22

    • D.

      23

    Correct Answer
    C. 22
    Explanation
    The correct answer is 22. The Capability Maturity Model Integration (CMMI) for Development has 22 process areas. These process areas cover various aspects of software development, including project management, requirements management, configuration management, and quality assurance. Each process area provides a set of best practices that organizations can use to improve their development processes and achieve higher levels of maturity.

    Rate this question:

  • 13. 

    ¿Cuál área de proceso establece la trazabilidad entre requerimientos y otros productos de trabajo del proyecto?

    • A.

      Solución Técnica (TS)

    • B.

      Gestión de Requerimientos (REQM)

    • C.

      Validación (VAL)

    • D.

      Verificación (VER)

    Correct Answer
    B. Gestión de Requerimientos (REQM)
    Explanation
    The correct answer is "Gestión de Requerimientos (REQM)". This area of process establishes the traceability between requirements and other work products of the project. It ensures that all requirements are identified, documented, and tracked throughout the project lifecycle. This helps in maintaining consistency and alignment between the project's objectives and the deliverables produced. REQM also facilitates communication and collaboration among stakeholders by providing a clear understanding of the requirements and their relationships with other project elements.

    Rate this question:

  • 14. 

    ¿Cuáles áreas de proceso se refieren a las interfases externas (entre el sistema y otros sistemas) o internas (entre componentes del produtco)?

    • A.

      Desarrollo de Requerimientos (RD)

    • B.

      Solución Técnica (TS)

    • C.

      Integración de Producto (PI)

    Correct Answer(s)
    A. Desarrollo de Requerimientos (RD)
    B. Solución Técnica (TS)
    C. Integración de Producto (PI)
    Explanation
    The areas of process that refer to external interfaces (between the system and other systems) or internal interfaces (between components of the product) are Desarrollo de Requerimientos (RD), Solución Técnica (TS), and Integración de Producto (PI). These processes involve the development of requirements, technical solutions, and the integration of the product with external or internal components.

    Rate this question:

  • 15. 

    ¿Cuáles de las siguientes son áreas de proceso del Nivel de Madurez 2?

    • A.

      Definición de Requerimientos (RD)

    • B.

      Gestión de Requerimientos (REQM)

    • C.

      Gestión Integrada de Proyecto (IPM)

    • D.

      Control y Monitorización de Proyecto (PMC)

    Correct Answer(s)
    B. Gestión de Requerimientos (REQM)
    D. Control y Monitorización de Proyecto (PMC)
    Explanation
    The correct answer is "Gestión de Requerimientos (REQM), Control y Monitorización de Proyecto (PMC)". These two areas of process, REQM and PMC, are part of Level 2 of the maturity model. REQM focuses on defining and managing requirements throughout the project, ensuring that they are properly documented, tracked, and communicated. PMC, on the other hand, involves monitoring and controlling the project's progress, including tracking project activities, managing risks, and ensuring that the project is on track to meet its objectives. Both of these areas are important for effectively managing and controlling projects at Level 2.

    Rate this question:

  • 16. 

    ¿Cuáles de las siguientes son áreas de proceso del Nivel de Madurez 3?

    • A.

      Definición de Requerimientos (RD)

    • B.

      Gestión de Requerimientos (REQM)

    • C.

      Gestión Integrada de Proyecto (IPM)

    • D.

      Control y Monitorización de Proyecto (PMC)

    Correct Answer(s)
    A. Definición de Requerimientos (RD)
    C. Gestión Integrada de Proyecto (IPM)
    Explanation
    The correct answer is Definición de Requerimientos (RD) and Gestión Integrada de Proyecto (IPM). These two areas of process are part of Level 3 maturity in the Capability Maturity Model Integration (CMMI). Definición de Requerimientos (RD) refers to the process of establishing and documenting the needs and expectations of stakeholders, while Gestión Integrada de Proyecto (IPM) involves coordinating and controlling all aspects of a project, including planning, execution, and monitoring. These processes are essential for organizations to achieve a higher level of maturity in managing their projects and requirements.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 22, 2012
    Quiz Created by
    David Arteaga
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.