1.
(201) When an I023 management notice indicates suitable interchangeable or substitute items are available for issue, with whom must Demand Processing personnel verify approval?
Correct Answer
C. Requesting agency
Explanation
Demand Processing personnel must verify approval with the requesting agency when an I023 management notice indicates suitable interchangeable or substitute items are available for issue. This is because the requesting agency is the one that made the initial request for the items and would need to approve any substitutions or interchangeables. The flight chief, commander, and responsible item manager may also be involved in the process, but ultimately it is the requesting agency that has the final say in approving the substitutions.
2.
(201) Issues from a supply point are considered
Correct Answer
B. Over-the-counter
Explanation
The correct answer is "over-the-counter." This means that the issues from a supply point are considered to be resolved directly at the point of sale, without the need for any formal documentation or authorization. This implies that the supply point has the authority to exchange or replace items on a one-for-one basis, without requiring any additional paperwork or approval. This method is often used for minor or routine issues that can be easily resolved without involving higher levels of management or complex procedures.
3.
(201) What do personnel in a supply point use to process issues when they are operating without a terminal function?
Correct Answer
C. Post-post, TEX 6
Explanation
Personnel in a supply point use the post-post, TEX 6 method to process issues when they are operating without a terminal function.
4.
(201) The computer transaction automatically created to record the withdrawl of a mobility readiness spares package asset to satisfy a mission capability requirement is called
Correct Answer
A. B9(x) MICAP report
Explanation
The correct answer is B9(x) MICAP report. This report is generated automatically by the computer system to record the withdrawal of a mobility readiness spares package asset in order to fulfill a mission capability requirement. It is a standardized report that helps track and document the transaction for inventory management purposes.
5.
(202) What activity code identifies an issue request as a core automated maintenance system document?
Correct Answer
C. J
Explanation
The activity code "J" identifies an issue request as a core automated maintenance system document.
6.
(202) What Standard Base Supply System output notifies the core automated maintenance system of changes in due-out status?
Correct Answer
B. 1SH
Explanation
The correct answer is 1SH. The 1SH Standard Base Supply System output notifies the core automated maintenance system of changes in due-out status.
7.
(203) How are cannibalizations processed for a mission capability termination?
Correct Answer
D. TRIC NOR, delete code 8
Explanation
When a mission capability is terminated, cannibalizations are processed using TRIC NOR and delete code 8. This means that the cannibalized parts will be removed from the aircraft and recorded as not operationally ready. This allows for accurate tracking of the parts and ensures that they are not mistakenly used in other missions or aircraft.
8.
(203) Which system provides visibility of mission capability and awaiting parts transactions by accepting transactions from depots and bases worldwide, maintains master records and reports for all levels of Air Logistics Center management, and provides the capability to reconcile your base's MICAP/AWP data with the depot?
Correct Answer
B. D165B
Explanation
The system that provides visibility of mission capability and awaiting parts transactions, maintains master records and reports for all levels of Air Logistics Center management, and allows reconciliation of base's MICAP/AWP data with the depot is D165B.
9.
(204) To perform the due-in from maintenance reconcilliation, what listing is used?
Correct Answer
C. D23
Explanation
The correct answer is D23. This listing is used to perform the due-in from maintenance reconciliation.
10.
(204) What due-in from maintenance detail records can be updated by the transaction identification code "DFM" input?
Correct Answer
C. Firm and memo
Explanation
The transaction identification code "DFM" input can update the due-in from maintenance detail records for both firm and memo transactions. It does not update the due-in for credit transactions.
11.
(205) When monitoring awaiting parts and end items, personnel at bases submit requests for repair parts on a fill or backorder basis using the urgency justification code
Correct Answer
D. "AR" or "BR"
Explanation
Personnel at bases submit requests for repair parts on a fill or backorder basis using the urgency justification code "AR" or "BR". This means that they can request repair parts either with immediate urgency (code "AR") or with a lower priority urgency (code "BR"). This allows personnel to prioritize their requests based on the urgency of the situation, ensuring that critical repairs are addressed promptly while less urgent repairs can be backordered.
12.
(206) Failure to process transaction identification code "TRN" data in a correct and timely manner results in reduced base stock levels and incomplete reports from which buy, repair, and distribution decisions are made by personnel in
Correct Answer
A. HQ AFMC
Explanation
Failure to process transaction identification code "TRN" data in a correct and timely manner at HQ AFMC can lead to reduced base stock levels and incomplete reports. This can have a significant impact on the decision-making process for buy, repair, and distribution decisions made by personnel at HQ AFMC.
13.
(206) What product would you use to verify transaction identification code "TRN" processing is completed?
Correct Answer
B. Daily Document Register
Explanation
The Daily Document Register would be the appropriate product to use in order to verify that the transaction identification code "TRN" processing is completed. This register keeps a record of all daily documents, including transactions, and allows for easy tracking and verification of their completion.
14.
(206) The net repair cycle days for a transaction identification code "TRN" input must be manually computed
Correct Answer
D. Upon receipt of a 256 Reject
Explanation
The net repair cycle days for a transaction identification code "TRN" input must be manually computed upon receipt of a 256 Reject. This means that when a 256 Reject is received, the net repair cycle days for the TRN input need to be calculated manually. This suggests that there is a specific process or calculation that needs to be followed in order to determine the repair cycle days for this particular transaction identification code.
15.
(207) To manage the flow of repair cycle assets properly, the preferred location for the processing of due-in from maintenance turn-ins is
Correct Answer
D. Repair cycle support
Explanation
The preferred location for the processing of due-in from maintenance turn-ins is repair cycle support. This means that the assets that need repair or maintenance should be handled and processed in the repair cycle support area. This ensures that the assets are properly managed and repaired before they are distributed or used for war readiness. The repair cycle support area is specifically designed and equipped to handle repairs and maintenance tasks efficiently.
16.
(207) The small groups of selected "XD" items that are candidates for two-level repair are known as
Correct Answer
A. DLR
Explanation
DLR stands for "Designated Level Repair." In the context of the question, DLR refers to the small groups of selected "XD" items that are candidates for two-level repair. This means that these items have been specifically chosen for repair at a designated level, which suggests that they may require more extensive repairs or attention compared to other items.
17.
(207) What listing will stock control personnel use to monitor property awaiting disposition instructions from the item manager?
Correct Answer
B. D23, Part 4
Explanation
Stock control personnel will use the listing in D23, Part 4 to monitor property awaiting disposition instructions from the item manager.
18.
(207) An XF3 item cannot be considered for condemnation unless it cannot be repaired or the cost to repair exceeds what percentage of the replacement cost?
Correct Answer
B. 75
Explanation
An XF3 item cannot be considered for condemnation unless the cost to repair exceeds 75% of the replacement cost. This means that if the cost to repair the item is less than 75% of the replacement cost, it can be repaired instead of being condemned. However, if the cost to repair exceeds 75% of the replacement cost, the item is considered not economically feasible to repair and can be condemned.
19.
(208) What supply condition code and action code is used to process a Product Quality/Materiel Deficiency Report turn-in?
Correct Answer
D. Q, C
Explanation
The supply condition code "Q" is used to indicate that the item being turned in is unserviceable and reparable. The action code "C" is used to indicate that the item is to be repaired or rehabilitated. Therefore, when processing a Product Quality/Materiel Deficiency Report turn-in, the supply condition code Q and action code C are used.
20.
(208) What input is used to load the warehouse location/Product Quality/Materiel Deficiency Report control number on the due-in from maintenance detail record?
Correct Answer
C. DFM
Explanation
The input used to load the warehouse location/Product Quality/Materiel Deficiency Report control number on the due-in from maintenance detail record is DFM.
21.
(209) What management level includes war reserve materiel equipment requirements in appropriate allowance documents and assigns composition codes to war reserve materiel allowance standards?
Correct Answer
B. HQ AFMC
Explanation
HQ AFMC is the correct answer because it is responsible for including war reserve materiel equipment requirements in appropriate allowance documents and assigning composition codes to war reserve materiel allowance standards. This management level is specifically tasked with overseeing the materiel management functional community and ensuring that the necessary equipment and resources are available for war reserve operations.
22.
(210) Which part of the S05 lists authorizations for which the computer could not find a war reserve materiel detail record?
Correct Answer
B. Two
23.
(210) What financial restraint supportability code is loaded to all initial and increased war reserve materiel authorizations to prevent unauthorized use of materiel management activity group money for war reserve materiel purposes?
Correct Answer
A. F
Explanation
The correct answer is F. In this context, the financial restraint supportability code F is loaded to all initial and increased war reserve materiel authorizations to prevent unauthorized use of materiel management activity group money for war reserve materiel purposes. This code ensures that the funds allocated for war reserve materiel are used appropriately and in accordance with the designated purpose.
24.
(210) What report lists unsupportable war reserve materiel requirements?
Correct Answer
B. Q07
25.
(211) How many days can a mobility readiness spares package support a weapon system or weapon support system in a deployed location before re-supply is necessary?
Correct Answer
B. 60
Explanation
A mobility readiness spares package (MRSP) can support a weapon system or weapon support system in a deployed location for 60 days before re-supply is necessary. This means that the MRSP contains enough spare parts, equipment, and supplies to sustain the weapon system for two months without needing additional resources. After 60 days, the MRSP would need to be replenished to ensure continued operational capability of the weapon system or support system.
26.
(211) What form is attached to readiness spares package functional check items before they are moved to maintenance?
Correct Answer
B. DD Form 1576
Explanation
Before readiness spares package functional check items are moved to maintenance, they are attached to DD Form 1576.
27.
(211) Who is accountable for materiel during a deployment of 130 days?
Correct Answer
C. Gaining CSB
Explanation
The gaining CSB (Consolidated Storage Base) is accountable for materiel during a deployment of 130 days. The CSB is responsible for receiving, storing, and issuing materiel to support the mission requirements. During a deployment, the CSB takes ownership and accountability of the materiel, ensuring its proper management and distribution. This includes tracking and maintaining accurate records of the materiel to ensure accountability and efficient logistics support.
28.
(211) How many days before a deployment can a CONUS unit restrict readiness spares package assets from Military Capability Asset Sourcing System lateral sourcing?
Correct Answer
B. 9
Explanation
A CONUS unit can restrict readiness spares package assets from Military Capability Asset Sourcing System lateral sourcing 9 days before a deployment. This means that the unit can prevent the sourcing of these assets from external sources 9 days prior to their deployment, ensuring that they have the necessary resources and equipment available for their mission.
29.
(211) What transaction identification code input produces the necessary transactions, record updates and files to upload at the gaining activity, and produces documentation to support the transfer of MRSP/IRSP/MSK detail records?
Correct Answer
C. 1WD
Explanation
The transaction identification code 1WD produces the necessary transactions, record updates, and files to upload at the gaining activity, and also generates documentation to support the transfer of MRSP/IRSP/MSK detail records.
30.
(211) When processing short-term equipment deployments, what transaction identification code input is used to deploy single items?
Correct Answer
A. 1ED
Explanation
The transaction identification code input used to deploy single items during short-term equipment deployments is 1ED.
31.
(211) When processing a short-term equipment deployment, what transaction identification code input and action code sets the deployed indicator to "D" and loads the deployed routing identifier to reflect where the asset is deployed?
Correct Answer
A. 1ED, D
Explanation
The transaction identification code "1ED" and action code "D" are used to set the deployed indicator to "D" and load the deployed routing identifier to reflect where the asset is deployed.
32.
(211) The Air Force Equipment Management System (C001) provides e-mail notices to the gaining accountable officer when deployed equipment assets are not reported received within
Correct Answer
A. 7 days
Explanation
The Air Force Equipment Management System (C001) sends e-mail notices to the gaining accountable officer if deployed equipment assets are not reported received within 7 days. This means that if the equipment is not accounted for within a week of being deployed, the system will automatically notify the accountable officer. This helps ensure that the equipment is properly tracked and accounted for, allowing for timely action to be taken if any discrepancies or issues arise.
33.
(212) Who selects the methods for document distribution and creation?
Correct Answer
A. Team Chief
Explanation
The Team Chief is responsible for selecting the methods for document distribution and creation. This implies that the Team Chief has the authority and knowledge to determine the most suitable methods for distributing and creating documents within the team. The other options, such as ELRS Commander, Accountable Officer, and Computer Operations, do not have the same level of responsibility or decision-making power in this context.
34.
(212) What system is used to process all transactions during degraded operations once the proper paperwork is completed?
Correct Answer
D. INMARSAT
Explanation
INMARSAT is the correct answer because it is a system used to process all transactions during degraded operations once the proper paperwork is completed. This system is designed to provide reliable and secure communication services in remote or challenging environments, making it ideal for processing transactions when other systems may be unavailable or compromised.
35.
(213) How many personnel and fighter squadrons will a BEAR Industrial Operations Set support?
Correct Answer
A. 3300 personnel/3 fighter squadrons
Explanation
A BEAR Industrial Operations Set will support 3300 personnel and 3 fighter squadrons.
36.
(213) Accountability of deployed BEAR assets are maintained for up to how many days on the account of the storing command's owning unit who shipped the assets?
Correct Answer
D. 179
Explanation
The accountability of deployed BEAR assets is maintained for up to 179 days on the account of the storing command's owning unit who shipped the assets. This means that the unit responsible for storing and shipping the assets is responsible for maintaining the records and tracking the assets for a period of 179 days.
37.
(214) During which phase of the deliberate planning process are support agreements drawn and finalized?
Correct Answer
D. V
Explanation
In phase V of the deliberate planning process, support agreements are drawn and finalized. This phase involves coordinating and integrating support plans with other organizations and agencies. It includes finalizing agreements for resources, logistics, and other support needed for the execution of the plan. This phase ensures that all necessary support is in place and that all parties involved are aware of their roles and responsibilities.
38.
(214) As it applies to wartime capability documents, what computer database tells you the who, what, where, when, and how things need to deploy if the operations plan is implemented?
Correct Answer
A. TPFDD
Explanation
The correct answer is TPFDD. TPFDD stands for Time-Phased Force and Deployment Data. It is a computer database that provides information on the who, what, where, when, and how of deploying resources during wartime operations. It helps in planning and coordinating the movement of personnel, equipment, and supplies to support the implementation of an operations plan.
39.
(214) For wartime capability, a unit that is fully combat ready is identified by a
Correct Answer
A. C-1 rating
Explanation
A unit that is fully combat ready is identified by a C-1 rating. This rating indicates that the unit has the highest level of readiness and is fully prepared for wartime operations. It suggests that the unit has adequate training, equipment, and personnel to effectively carry out its mission in a combat environment.
40.
(215) What wartime capability system provides HQ USAF, AF component commanders, MAJCOMs, and the Aerospace Expeditionary Force Center readiness information to employ, manage, and sustain Expeditionary Air Force operations?
Correct Answer
A. ART
Explanation
The correct answer is ART. ART stands for Air Expeditionary Force Reporting Tool. It is a wartime capability system that provides HQ USAF, AF component commanders, MAJCOMs, and the Aerospace Expeditionary Force Center with readiness information to employ, manage, and sustain Expeditionary Air Force operations. It helps in tracking and reporting the readiness status of air expeditionary forces and enables effective planning and execution of air operations during wartime.
41.
(216) What allowance manager has the responsibility for the final review and approval or disapproval of organizational and individual equipment items, quantities and basis of issue, and non-routine requests to be included in equipment allowance standards?
Correct Answer
B. AFEMS
Explanation
AFEMS, which stands for Air Force Equipment Management System, is the allowance manager responsible for the final review and approval or disapproval of organizational and individual equipment items, quantities and basis of issue, and non-routine requests to be included in equipment allowance standards. This system ensures that equipment allowances are accurate and appropriate for the needs of the organization.
42.
(217) A custodian used what Air Force form to request non-equipment authorization inventory data items?
Correct Answer
A. 2005
Explanation
The custodian used the 2005 Air Force form to request non-equipment authorization inventory data items.
43.
(217) Non-equipment authorization inventory data item requests are identifed by what Expendability, Recoverability, Reparability, Cost Designator?
Correct Answer
A. NF1
Explanation
Non-equipment authorization inventory data item requests are identified by the Expendability, Recoverability, Reparability, Cost Designator code NF1. This code is used to classify and track inventory items that do not require equipment authorization.
44.
(217) What Air Force form is used to request a change to an allowance standard or an equipment item whose basis of issue requires approval above wing or base level?
Correct Answer
B. 601
Explanation
Air Force form 601 is used to request a change to an allowance standard or an equipment item whose basis of issue requires approval above wing or base level. This form is specifically designed for this purpose and allows personnel to submit their requests for changes in a standardized manner. It ensures that all necessary information is provided and allows for proper review and approval processes to take place.
45.
(217) What menu option in the Air Force Equipment Management System (C001) is used to enter equipment allowance change requests electronically?
Correct Answer
C. TACR
Explanation
TACR is the menu option in the Air Force Equipment Management System (C001) that is used to enter equipment allowance change requests electronically.
46.
(218) A reporting organization file is accomplished
Correct Answer
B. Weekly
Explanation
A reporting organization file is accomplished on a weekly basis. This means that the file is completed, updated, or processed every week. This regular schedule allows for consistent tracking and monitoring of the organization's data and information. It ensures that the file is always up to date and accurate, providing timely insights and analysis for decision-making purposes.
47.
(219) Personnel at what Air Force activity maintains a central file of all weapon items by serial number?
Correct Answer
D. Warner-Robins Air Logistics Center
Explanation
The Warner-Robins Air Logistics Center is responsible for maintaining a central file of all weapon items by serial number. This means that they keep a record of every weapon item and its corresponding serial number. This is important for tracking and managing the weapons inventory, as well as for ensuring accountability and security. The other options, Ogden Air Logistics Center, San Antonio Air Logistics Center, and Oklahoma Air Logistics Center, are not mentioned as being responsible for this specific task.
48.
(219) Serial numbers for weapon items on hand in the LRS are maintained on what type detail?
Correct Answer
A. 249
Explanation
The correct answer is 249. This implies that the serial numbers for weapon items on hand in the LRS are maintained on a type 249 detail.
49.
(219) What is sent from the Serial Number Control System to a base that fails to process the communication security reconcilliation as required?
Correct Answer
D. XHB, COMSEC control reject report with COMSEC error notification code "7B"
Explanation
The correct answer is XHB, COMSEC control reject report with COMSEC error notification code "7B". This report is sent from the Serial Number Control System to a base that fails to process the communication security reconciliation as required. The report notifies the base about the error and provides the specific error notification code "7B". This allows the base to identify and address the specific issue that caused the failure in processing the communication security reconciliation.
50.
(220) What type of adjusted stock level is used to restrict stockage?
Correct Answer
C. Maximum
Explanation
The maximum adjusted stock level is used to restrict stockage. This means that there is a predefined upper limit to the amount of stock that can be held at any given time. Once the stock reaches this maximum level, further stockage is restricted, preventing any additional stock from being stored. This helps to ensure efficient inventory management and avoid overstocking, which can lead to increased holding costs and potential waste.