The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Quizcreationhelp
Q
Quizcreationhelp
Community Contributor
Quizzes Created: 3 | Total Attempts: 314
Questions: 33 | Attempts: 96

SettingsSettingsSettings
Education Quizzes & Trivia

Questions and Answers
  • 1. 

    Questions about how long a project’s schedule should be are related to the issue of the project’s scope.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The given statement suggests that questions about the length of a project's schedule are related to the project's scope. However, the correct answer is False, indicating that this statement is incorrect. Therefore, the explanation is that the statement is false and there is no direct relationship between the length of a project's schedule and its scope.

    Rate this question:

  • 2. 

    There are six core knowledge areas of project management.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The statement is false because there are actually ten core knowledge areas of project management, as defined by the Project Management Institute (PMI). These areas include integration management, scope management, time management, cost management, quality management, human resource management, communications management, risk management, procurement management, and stakeholder management.

    Rate this question:

  • 3. 

    Program managers are not responsible for coordinating the efforts of project teams, functional groups, suppliers, and operations staff.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    Program managers are responsible for coordinating the efforts of project teams, functional groups, suppliers, and operations staff. This means that they are responsible for ensuring that all these different groups work together effectively to achieve the program's objectives. Therefore, the statement that program managers are not responsible for coordinating these efforts is incorrect.

    Rate this question:

  • 4. 

    Project ____ management is an overarching function that affects and is affected by all of the other knowledge areas.

    • A.

      Cost

    • B.

      Quality

    • C.

      Integration

    • D.

      Time

    Correct Answer
    C. Integration
    Explanation
    Integration management is the correct answer because it is the overarching function that coordinates and integrates all the other knowledge areas of a project. It involves combining all the different project management processes and activities to ensure that they work together effectively and efficiently. Integration management ensures that the project is well-planned, executed, and controlled, and that all the different knowledge areas are properly coordinated and integrated to achieve the project objectives. It is crucial for the success of a project as it ensures that all the different components of the project are working together harmoniously.

    Rate this question:

  • 5. 

    “All project leaders use a shared road map, focusing on key business aspects of their projects while integrating goals across all parts of the organization” describes the ____ best practice for project delivery.

    • A.

      Use an integrated toolbox

    • B.

      Grow project leaders

    • C.

      Develop a streamlined project delivery process

    • D.

      Measure project health using metrics

    Correct Answer
    C. Develop a streamlined project delivery process
    Explanation
    The given answer, "Develop a streamlined project delivery process," is the best practice for project delivery because it emphasizes the use of a shared road map and integration of goals across all parts of the organization. This approach ensures that project leaders have a clear understanding of the key business aspects of their projects and allows for effective coordination and alignment of efforts throughout the organization. By developing a streamlined project delivery process, organizations can enhance efficiency, reduce risks, and improve overall project outcomes.

    Rate this question:

  • 6. 

    A(n) ____ focuses on long-term goals and big-picture objectives, while inspiring people to reach those goals.

    • A.

      Assistant

    • B.

      Programmer

    • C.

      Leader

    • D.

      Manager

    Correct Answer
    C. Leader
    Explanation
    A leader is someone who focuses on long-term goals and big-picture objectives, while inspiring people to reach those goals. They provide guidance, direction, and motivation to their team members, encouraging them to work towards a common vision. Leaders are responsible for setting the overall direction of a group or organization and ensuring that everyone is aligned and working towards the same objectives. They possess strong communication and interpersonal skills, and are able to inspire and influence others to achieve their full potential.

    Rate this question:

  • 7. 

    In ____, Henry Gantt developed the famous Gantt chart as a tool for scheduling work in factories.

    • A.

      1897

    • B.

      1917

    • C.

      1927

    • D.

      1957

    Correct Answer
    B. 1917
    Explanation
    In 1917, Henry Gantt developed the famous Gantt chart as a tool for scheduling work in factories. This chart allowed managers to visually track and manage the progress of projects, making it easier to allocate resources and meet deadlines. The Gantt chart revolutionized project management by providing a clear and concise way to plan, schedule, and track tasks. It remains a widely used tool in various industries to this day.

    Rate this question:

  • 8. 

    When you separate business and organizational issues from project management planning, you do a better job of ensuring project success.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    When you separate business and organizational issues from project management planning, you do not necessarily do a better job of ensuring project success. This statement implies that separating business and organizational issues from project management planning would lead to improved project success, but this is not always the case. In reality, project success depends on various factors, including effective communication, stakeholder management, resource allocation, and risk management, all of which are interconnected with business and organizational issues. Therefore, it is important to consider these factors holistically rather than separating them from project management planning.

    Rate this question:

  • 9. 

    Assigning staff part-time to the project often creates underutilization and/or misallocation of staff resources.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    Assigning staff part-time to a project does not necessarily create underutilization and/or misallocation of staff resources. In fact, it can be a strategic approach to optimize resource allocation and ensure efficient utilization of staff members. By assigning staff part-time, organizations can leverage their skills and expertise across multiple projects, thereby maximizing productivity and minimizing idle time. However, it is important to carefully plan and manage the allocation of part-time staff to avoid any potential issues or inefficiencies.

    Rate this question:

  • 10. 

    An organizational culture with strong unit integration makes the project manager’s job more difficult.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    An organizational culture with strong unit integration actually makes the project manager's job easier. When there is strong unit integration, it means that different departments or units within the organization are working together seamlessly and collaboratively. This promotes effective communication, coordination, and cooperation among team members, which in turn leads to smoother project execution. The project manager can rely on the support and involvement of various units, making it easier to achieve project goals and objectives.

    Rate this question:

  • 11. 

    If project managers have functional management commitment, they will also have adequate resources and not be distracted by events that do not affect their specific projects.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    If project managers have functional management commitment, it does not necessarily mean that they will have adequate resources and not be distracted by events that do not affect their specific projects. Functional management commitment refers to the support and involvement of functional managers in the project, but it does not guarantee the availability of resources or the absence of distractions. These factors can vary depending on the specific circumstances and organizational dynamics. Therefore, the statement is false.

    Rate this question:

  • 12. 

    ____ is a problem-solving approach that requires defining the scope of the system, dividing it into its components, and then identifying and evaluating its problems, opportunities, constraints, and needs.

    • A.

      Systems philosophy

    • B.

      Systems management

    • C.

      Systems troubleshooting

    • D.

      Systems analysis

    Correct Answer
    D. Systems analysis
    Explanation
    Systems analysis is a problem-solving approach that involves defining the scope of a system, breaking it down into its components, and then identifying and evaluating its problems, opportunities, constraints, and needs. This approach helps in understanding the system as a whole and allows for effective problem-solving and decision-making. It is a crucial step in developing and improving systems to meet the desired objectives.

    Rate this question:

  • 13. 

    The ____ focuses on different groups’ roles and responsibilities in order to meet the goals and policies set by top management.

    • A.

      Structural frame

    • B.

      Human resources frame

    • C.

      Political frame

    • D.

      Symbolic frame

    Correct Answer
    A. Structural frame
    Explanation
    The structural frame focuses on different groups' roles and responsibilities in order to meet the goals and policies set by top management. This frame emphasizes the organization's structure, hierarchy, and division of labor to ensure that each group is clear about their responsibilities and how they contribute to the overall objectives. It emphasizes efficiency, coordination, and control within the organization.

    Rate this question:

  • 14. 

    In a ____ matrix organizational structure, the project manager controls the project budget and has moderate to high authority.

    • A.

      Weak

    • B.

      Balanced

    • C.

      Strong

    • D.

      Functional

    Correct Answer
    C. Strong
    Explanation
    In a strong matrix organizational structure, the project manager has a high level of authority and control over the project budget. This means that the project manager has significant decision-making power and can allocate resources and funds as needed for the successful completion of the project. This structure allows the project manager to have a strong influence on the project's direction and outcomes.

    Rate this question:

  • 15. 

    The ____ model requires heavy user involvement, and developers use a model to generate functional requirements and physical design specifications simultaneously.

    • A.

      RAD life cycle

    • B.

      Prototyping life cycle

    • C.

      Spiral life cycle

    • D.

      Incremental build life cycle

    Correct Answer
    B. Prototyping life cycle
    Explanation
    The prototyping life cycle model requires heavy user involvement, as it focuses on quickly creating prototypes of the system to gather feedback and refine requirements. Developers use this model to generate functional requirements and physical design specifications simultaneously, allowing for rapid iteration and refinement of the system. This model is particularly useful when the requirements are not well-defined or when there is a need for frequent user involvement and feedback.

    Rate this question:

  • 16. 

    Information systems must support the firm’s business goals, such as developing its own intranet site applications.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The statement is false because information systems do not necessarily have to support the firm's business goals. While it is beneficial for information systems to align with the business goals, it is not a requirement. Information systems can also be used for various other purposes such as data analysis, communication, and decision-making, which may not directly relate to the firm's business goals. Therefore, the statement is incorrect.

    Rate this question:

  • 17. 

    Some project managers do not even write down stakeholder information because they do not consider stakeholder management as a crucial part of their jobs.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The statement suggests that some project managers do not consider stakeholder management as a crucial part of their jobs, implying that they may not prioritize gathering and documenting stakeholder information. However, the correct answer is False, indicating that the statement is not true. This means that project managers should consider stakeholder management as a crucial part of their jobs and should write down stakeholder information to effectively manage and engage with stakeholders throughout the project.

    Rate this question:

  • 18. 

    A milestone list is an output list associated with the Project Scope Management knowledge area.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    A milestone list is not an output of the Project Scope Management knowledge area. It is actually an output of the Project Schedule Management knowledge area. The milestone list is a document that identifies all the project milestones, which are significant events or achievements in the project that are used to track progress and make informed decisions.

    Rate this question:

  • 19. 

    The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
    Explanation
    The Work Breakdown Structure (WBS) is a hierarchical decomposition of the project scope that provides a framework for planning and organizing project tasks. It helps in creating the project schedule by breaking down the work into smaller, manageable components. Additionally, the WBS is essential for performing earned value management, which is a project management technique for measuring and forecasting project performance. By tracking the progress of work packages and comparing it to the planned schedule and budget, earned value management helps in assessing project performance and making informed decisions. Therefore, the statement is true.

    Rate this question:

  • 20. 

    Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The given answer is False because project initiation does not involve ensuring that activities in the project plan are completed. Project initiation is the first phase of the project management process where the project is defined, its objectives are established, and the project team is assembled. It includes activities such as creating a project charter, identifying stakeholders, and conducting initial feasibility studies. The completion of activities in the project plan occurs in later phases of the project, such as project execution and closure.

    Rate this question:

  • 21. 

    ____ include defining and authorizing a project or project phase.

    • A.

      Initiating processes

    • B.

      Planning processes

    • C.

      Executing processes

    • D.

      Monitoring and controlling processes

    Correct Answer
    A. Initiating processes
    Explanation
    Initiating processes involve defining and authorizing a project or project phase. This includes activities such as identifying stakeholders, defining project objectives, and obtaining approval to proceed with the project. These processes lay the foundation for the project and set the direction for the entire project lifecycle. They ensure that the project is properly initiated and aligned with the organization's goals and objectives.

    Rate this question:

  • 22. 

    Examples of ____ include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements.

    • A.

      Monitoring and controlling processes

    • B.

      Executing processes

    • C.

      Planning processes

    • D.

      Initiating processes

    Correct Answer
    B. Executing processes
    Explanation
    The given answer, "executing processes," is the correct one because the examples listed, such as acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements, all fall under the category of executing processes. These activities are part of the execution phase of a project, where the project plan is put into action and the work is carried out.

    Rate this question:

  • 23. 

    ____ is crucial in information technology projects because once a project team implements a new system, it takes a considerable amount of effort to change the system.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Closing

    Correct Answer
    B. Planning
    Explanation
    Planning is crucial in information technology projects because once a project team implements a new system, it takes a considerable amount of effort to change the system. During the planning phase, the project team identifies the goals, objectives, and requirements of the project, as well as the resources and timeline needed for successful implementation. By thoroughly planning the project, potential risks and issues can be identified and addressed in advance, reducing the need for major changes or rework once the system is implemented. This saves time, effort, and resources, making planning a crucial step in ensuring the success of information technology projects.

    Rate this question:

  • 24. 

    The project integration management knowledge area maps to the ____ process group through the activities of developing project charters.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Monitoring and controlling

    Correct Answer
    A. Initiating
    Explanation
    The project integration management knowledge area maps to the initiating process group through the activities of developing project charters. This is because the initiating process group is responsible for formally authorizing the project or phase and defining its initial scope and objectives. Developing project charters is one of the key activities in the initiating process group as it involves creating a document that formally recognizes the existence of the project and provides the project manager with the authority to apply organizational resources to project activities.

    Rate this question:

  • 25. 

    ____ is a planning process falling under the Project Integration Management knowledge area.

    • A.

      Schedule development

    • B.

      Develop project management plan

    • C.

      Create WBS

    • D.

      Quality planning

    Correct Answer
    B. Develop project management plan
    Explanation
    Develop project management plan is a planning process falling under the Project Integration Management knowledge area. This process involves creating a comprehensive document that outlines how the project will be executed, monitored, and controlled. It includes defining project objectives, scope, deliverables, stakeholders, and other key elements. The project management plan serves as a roadmap for the project and guides the project team throughout its execution. It integrates all other project management processes and provides a framework for effective project management.

    Rate this question:

  • 26. 

    ____ is a planning process falling under the Project Scope Management knowledge area.

    • A.

      Schedule development

    • B.

      Develop project management plan

    • C.

      Create WBS

    • D.

      Quality planning

    Correct Answer
    C. Create WBS
    Explanation
    Create WBS is a planning process falling under the Project Scope Management knowledge area. This process involves breaking down the project deliverables and work into smaller, more manageable components called work breakdown structure (WBS) elements. The WBS provides a hierarchical structure that helps in organizing and defining the scope of the project. It is an essential step in project planning as it helps in identifying all the necessary activities and tasks required to complete the project successfully.

    Rate this question:

  • 27. 

    ____ is a monitoring and controlling process.

    • A.

      Develop project team

    • B.

      Request seller responses

    • C.

      Risk response planning

    • D.

      Integrated change control

    Correct Answer
    D. Integrated change control
    Explanation
    Integrated change control is a monitoring and controlling process in project management. It involves reviewing and approving or rejecting changes to the project scope, schedule, and budget. This process ensures that all changes are properly evaluated, documented, and implemented in a controlled manner. It also helps in minimizing the impact of changes on the project's objectives and ensures that all changes align with the overall project plan.

    Rate this question:

  • 28. 

    The project cost management knowledge area maps to the ____ process group through the activities of estimating costs and budget determination.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Monitoring and controlling

    Correct Answer
    B. Planning
    Explanation
    The project cost management knowledge area maps to the planning process group through the activities of estimating costs and budget determination. This is because during the planning phase of a project, the project team is responsible for estimating the costs associated with the project and determining the budget that will be allocated to each activity. This helps in creating a comprehensive plan for the project and ensures that the necessary resources are allocated effectively.

    Rate this question:

  • 29. 

    The project communications management knowledge area maps to the ____ process group through the activity of information distribution.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Monitoring and controlling

    Correct Answer
    C. Executing
    Explanation
    The project communications management knowledge area maps to the executing process group through the activity of information distribution. This means that during the execution phase of a project, the project team is responsible for actively distributing information to stakeholders. This ensures that all relevant parties are kept informed and updated on the progress of the project. By doing so, the project team can effectively communicate with stakeholders and address any concerns or issues that may arise during the execution phase.

    Rate this question:

  • 30. 

    The project procurement management knowledge area maps to the ____ process group through the activity of administering procurements.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Monitoring and controlling

    Correct Answer
    D. Monitoring and controlling
    Explanation
    The project procurement management knowledge area is responsible for managing the procurement process, which involves acquiring goods and services from external vendors. The activity of administering procurements falls under the monitoring and controlling process group. This process group is focused on tracking and reviewing the progress of the project, making sure that it is on track and within budget. Therefore, the correct answer is monitoring and controlling.

    Rate this question:

  • 31. 

    The project procurement management knowledge area maps to the ____ process group through the activities conducting procurements.

    • A.

      Initiating

    • B.

      Planning

    • C.

      Executing

    • D.

      Monitoring and controlling

    Correct Answer
    C. Executing
    Explanation
    The project procurement management knowledge area maps to the executing process group through the activities conducting procurements. This means that during the executing phase of a project, the project team is actively engaged in the procurement process, which includes tasks such as identifying potential vendors, soliciting bids or proposals, evaluating and selecting vendors, and negotiating contracts. The executing process group is where the actual work of the project is carried out, and in the case of procurement management, it involves the implementation and management of the procurement activities.

    Rate this question:

  • 32. 

    A ____ is an approach to help increase the support of stakeholders throughout the project.

    • A.

      Stakeholder management plan

    • B.

      Stakeholder strategy

    • C.

      Stakeholder management strategy

    • D.

      Stakeholder management list

    Correct Answer
    C. Stakeholder management strategy
    Explanation
    A stakeholder management strategy is an approach that is used to increase the support of stakeholders throughout a project. This strategy involves identifying and analyzing the needs and expectations of stakeholders, developing effective communication and engagement plans, and implementing strategies to address any potential issues or conflicts that may arise. By having a well-defined stakeholder management strategy in place, project teams can ensure that stakeholders are actively involved and supportive throughout the project lifecycle.

    Rate this question:

  • 33. 

    Quality metrics are an output of project ____.

    • A.

      Cost management

    • B.

      Scope management

    • C.

      Integration management

    • D.

      Quality management

    Correct Answer
    D. Quality management
    Explanation
    Quality metrics are an output of project quality management. This is because quality management involves establishing and implementing processes to ensure that project deliverables meet the required quality standards. Quality metrics are used to measure and evaluate the quality of the project deliverables and processes. By monitoring these metrics, project managers can identify areas for improvement and take corrective actions to ensure that the project meets the desired level of quality.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 14, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Mar 05, 2012
    Quiz Created by
    Quizcreationhelp
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.