Identificación De Alarmas En Equipos De Fuerza

Approved & Edited by ProProfs Editorial Team
The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Hugo Lopez
Hugo Lopez
Community Contributor
Quizzes Created: 5 | Total Attempts: 9,546
Questions: 66 | Attempts: 1,485

SettingsSettingsSettings
Identificación De Alarmas En Equipos De Fuerza - Quiz


Questions and Answers
  • 1. 

    ¿A cuantos grados centígrados se debe calentar el termostato de la sala acondicionada para que mande la alarma de alta temperatura?

    • A.

      26 ºC

    • B.

      24 ºC

    • C.

      28 ºC

    • D.

      27 ºC

    Correct Answer
    A. 26 ºC
    Explanation
    The correct answer is 26 ºC. This means that the thermostat in the conditioned room needs to be heated to 26 ºC in order for it to trigger the high temperature alarm.

    Rate this question:

  • 2. 

    Cuál es el mnemónico de alarmas en centrales distribuidas S-12 de temperatura alta para un equipo de clima de acuerdo con la subdirección de soporte técnico de Alcatel Indentel?

    • A.

      ETEO

    • B.

      TMPA

    • C.

      RECT

    • D.

      XPOW

    Correct Answer
    A. ETEO
    Explanation
    The correct answer is ETEO. This is the mnemonic for alarms in S-12 distributed control centers for high temperature in a climate equipment, according to the technical support subdirection of Alcatel Indentel.

    Rate this question:

  • 3. 

    Cuál es el nombre del equipo que tiene como función medir voltaje y corriente mediante instrumentos de medición de voltaje y corriente en batería y distribución, además de que la corriente total de la planta será la suma de las corrientes en todos los módulos de este tipo que se tenga?​

    • A.

      Tablero de control y alarmas en plantas de c.d

    • B.

      Tableros de distribución y batería

    • C.

      Multimetro

    • D.

      Centro de carga

    Correct Answer
    A. Tablero de control y alarmas en plantas de c.d
    Explanation
    The correct answer is "Tablero de control y alarmas en plantas de c.d". This is because the question is asking for the name of the team that is responsible for measuring voltage and current using voltage and current measuring instruments in battery and distribution systems, and where the total current of the plant is the sum of the currents in all modules of this type. "Tablero de control y alarmas en plantas de c.d" refers to the control panel and alarm system in direct current plants, which would include the necessary instruments for measuring voltage and current.

    Rate this question:

  • 4. 

    Cuál es la descripción de alarmas de corriente alterna para concentrador de AXE, de acuerdo a la norma de estandarización de alarmas para grupo electrógeno bloqueado?

    • A.

      Gpo*elect*bloqueado

    • B.

      Gpo*elect*en*operación

    • C.

      Falla*alim*commercial

    • D.

      G.elec.bl

    Correct Answer
    A. Gpo*elect*bloqueado
    Explanation
    The correct answer "gpo*elect*bloqueado" refers to the description of the alarm for a blocked electronic group. This means that there is an issue or malfunction with the electronic group, causing it to be blocked or unable to function properly.

    Rate this question:

  • 5. 

    ¿Cuál es mnemónico de falla de rectificador de una central host de S-12 para una planta de c.d.?

    • A.

      RECT

    • B.

      Falla*planta*cd

    • C.

      Falla*cd*XXX

    • D.

      Falla cd

    Correct Answer
    A. RECT
    Explanation
    The mnemonic for rectifier failure in an S-12 host plant for a DC power plant is RECT.

    Rate this question:

  • 6. 

    Cuáles son los tipos de subestaciones que tenemos en Telmex ?

    • A.

      Tipo poste, compacta y pedestal

    • B.

      Poste, Compacta y Subterránea

    • C.

      Compacta, de piso, y de pedestal

    • D.

      Puto el que lo lea

    Correct Answer
    A. Tipo poste, compacta y pedestal
    Explanation
    The correct answer is "Tipo poste, compacta y pedestal". This answer lists the three types of substations that are available in Telmex, which are "poste" (pole), "compacta" (compact), and "pedestal" (pedestal).

    Rate this question:

  • 7. 

    De acuerdo con la norma para la estandarización de alarmas, la configuración de existencia de alarmas debe ser:

    • A.

      Circuito Cerrado a tierra

    • B.

      Circuito Abierto

    • C.

      Circuito Cerrado a BT

    • D.

      Circuito Abierto a BT

    Correct Answer
    A. Circuito Cerrado a tierra
    Explanation
    According to the standard for alarm standardization, the configuration for alarm existence should be "Circuito Cerrado a tierra" which means "Closed Circuit to ground" in English.

    Rate this question:

  • 8. 

    De acuerdo a la norma de estandarización de alarmas, para una central 5ESS, la alarma de alta temperatura de sala digital debe aparecer con el texto:

    • A.

      Alta temp

    • B.

      Alta*temp*sala*digital

    • C.

      Alta*temp*XXX

    • D.

      TMPA

    Correct Answer
    A. Alta temp
    Explanation
    The correct answer is "Alta temp" because according to the standardization norm for alarms in a 5ESS central, the alarm for high temperature in the digital room should appear with this text. The other options provided are not specified in the norm and therefore are not correct.

    Rate this question:

  • 9. 

    De acuerdo a la norma de estandarización de alarmas, para una central 5ESS, la alarma de falla rectificador debe aparecer con el texto:

    • A.

      Falla cd

    • B.

      RECT

    • C.

      Falla*planta*cd

    • D.

      Falla*cd*XXX

    Correct Answer
    A. Falla cd
    Explanation
    According to the standardization norm for alarms in a 5ESS central, the correct text for the rectifier failure alarm should be "Falla cd".

    Rate this question:

  • 10. 

    De acuerdo a la norma de estandarización de alarmas, para una central 5ESS, la alarma de grupo electrógeno bloqueado debe aparecer con el texto:

    • A.

      G.elec.bl

    • B.

      Gpo*elect*bloqueado

    • C.

      Gpo*elect*en*operación

    • D.

      Falla*alim*commercial

    Correct Answer
    A. G.elec.bl
    Explanation
    The correct answer is "g.elec.bl" because it is the abbreviation for "grupo electrógeno bloqueado" which translates to "generator group blocked" in English. This alarm indicates that there is an issue with the generator and it is not functioning properly.

    Rate this question:

  • 11. 

    De acuerdo a la norma de estandarización de alarmas, para una central Host de AXE, la alarma de grupo electrógeno en operación debe aparecer con el texto:

    • A.

      Gpo*elect*en*operación

    • B.

      Gpo*elect*op*XXX

    • C.

      G.elec.op

    • D.

      Click aqui si eres gay

    Correct Answer
    A. Gpo*elect*en*operación
    Explanation
    According to the standardization norm for alarms in a AXE Host central, the correct text for the alarm indicating that the generator group is in operation is "gpo*elect*en*operación". This aligns with the format and terminology used for alarms in this system. The other options provided are either incorrect or unrelated to the alarm being described.

    Rate this question:

  • 12. 

    De acuerdo con la subdirección de soporte técnico de Alcatel, a la alarma de falla de energía comercial en una central HOST de sistema 12 le corresponde el mnemónico

    • A.

      XPOW

    • B.

      EGEN

    • C.

      ETEO

    • D.

      TMPA

    Correct Answer
    A. XPOW
    Explanation
    According to the technical support department of Alcatel, the mnemonic for the commercial power failure alarm in a system 12 HOST central is XPOW.

    Rate this question:

  • 13. 

    De acuerdo con la subdirección de soporte técnico de Alcatel, a la alarma de temperatura en una central de sistema 12 Host, le corresponde el mnemónico:

    • A.

      TMPA

    • B.

      ETEO

    • C.

      RECT

    • D.

      XPOW

    Correct Answer
    A. TMPA
    Explanation
    La respuesta correcta es TMPA.

    Rate this question:

  • 14. 

    Dentro de las verificaciones previas a los bancos de baterías de plomo ácido es necesario revisar la densidad de estas ¿Cuál es el valor que deben de tener para que estén con buena carga?

    • A.

      1200 – 1220 g/dm (cúbicos)

    • B.

      1220 – 1240 g/dm (cúbicos)

    • C.

      1200 - 1240 g/dm (cúbicos)

    • D.

      1210 – 1220 g/dm (cúbicos)

    Correct Answer
    A. 1200 – 1220 g/dm (cúbicos)
    Explanation
    In order for lead-acid batteries to be considered well-charged, they should have a density value between 1200 and 1220 g/dm³.

    Rate this question:

  • 15. 

    Dentro de los parámetros de operación del grupo electrógeno, el bloqueo por sobre corriente opera al:

    • A.

      90% de la capacidad del generador

    • B.

      80 % de la capacidad del generador

    • C.

      98 % de la capacidad del generador

    • D.

      95 % de la capacidad del generador

    Correct Answer
    A. 90% de la capacidad del generador
    Explanation
    The correct answer is 90% de la capacidad del generador. This means that the overcurrent lockout operates when the current exceeds 90% of the generator's capacity. This safety feature is designed to protect the generator from damage caused by excessive current flow. When the current reaches or exceeds this threshold, the generator will automatically shut down to prevent further damage.

    Rate this question:

  • 16. 

    El bloqueo por alta temperatura en los grupos electrógenos con monitores que no son Cummins, opera a:

    • A.

      92 ºC

    • B.

      95 ºC

    • C.

      105 ºC

    • D.

      110 ºC

    Correct Answer
    A. 92 ºC
    Explanation
    The correct answer is 92 ºC. This means that the high-temperature lockout feature in the electronic control units of the generators, which are not Cummins, operates at a temperature of 92 ºC. This feature is designed to protect the generator from overheating and potential damage by shutting it down when the temperature exceeds this threshold.

    Rate this question:

  • 17. 

    El colocar el selector de operación en la posición cero o fuera en algunos tableros, ocasiona una alarma de:

    • A.

      Falla planta

    • B.

      Falla de red

    • C.

      Planta en operación

    • D.

      Falla de Tablero

    Correct Answer
    A. Falla planta
    Explanation
    Cuando se coloca el selector de operación en la posición cero o fuera en algunos tableros, se produce una alarma de "Falla planta". Esto indica que ha ocurrido un problema en la planta o en su funcionamiento, lo que puede requerir atención y reparación para restaurar su operatividad normal.

    Rate this question:

  • 18. 

    En el grupo electrógeno, el largo tiempo de arranque para 1 intento, tiene un valor de ajuste de:

    • A.

      12-18 seg

    • B.

      10-15 seg

    • C.

      12-15 seg

    • D.

      15-18 seg

    Correct Answer
    A. 12-18 seg
    Explanation
    The correct answer is 12-18 seg. This means that the starting time for one attempt in the generator is between 12 and 18 seconds. This range allows for a sufficient amount of time for the generator to start up and begin producing electricity. It indicates that the generator may take up to 18 seconds to start, but it could also start as quickly as 12 seconds.

    Rate this question:

  • 19. 

    En el grupo electrógeno, el largo tiempo de arranque para 2-5 intentos, tiene un valor de ajuste de:

    • A.

      10-15 seg

    • B.

      12-18 seg

    • C.

      12-15 seg

    • D.

      15-18 seg

    Correct Answer
    A. 10-15 seg
    Explanation
    The correct answer is 10-15 seg. This means that the generator takes a long time to start, typically between 10 and 15 seconds, and requires 2-5 attempts to successfully start.

    Rate this question:

  • 20. 

    En el grupo electrógeno, la presión de aceite normal de trabajo en el motor debe estar entre:

    • A.

      40 y 60 lb/pulg*

    • B.

      20 y 40 lb/pulg

    • C.

      30 y 50 lb/pulg

    • D.

      50 y 60 lb/pulg

    Correct Answer
    A. 40 y 60 lb/pulg*
    Explanation
    The correct answer is 40 y 60 lb/pulg. In a generator set, the normal working oil pressure in the engine should be between 40 and 60 lb/in². This range ensures proper lubrication and cooling of the engine components, preventing excessive wear and overheating. Maintaining the correct oil pressure is crucial for the efficient and reliable operation of the generator set.

    Rate this question:

  • 21. 

    En equipos de clima como los de precisión se tiene sistemas propios de supervisión, en estos podemos tener alarmas no urgentes como:

    • A.

      Bajo flujo

    • B.

      Fuga de Agua

    • C.

      Alta humedad

    • D.

      Alta temperatura

    Correct Answer
    A. Bajo flujo
    Explanation
    In climate control equipment, such as precision systems, there are built-in monitoring systems. These systems can detect various non-urgent alarms, including low flow, water leakage, high humidity, and high temperature.

    Rate this question:

  • 22. 

    En equipos de clima como los de precisión se tiene sistemas propios de supervisión, en estos podemos tener alarmas no urgentes como:

    • A.

      Baja Humedad

    • B.

      Fuga de Agua

    • C.

      Alta humedad

    • D.

      Alta temperatura

    Correct Answer
    A. Baja Humedad
    Explanation
    In precision climate control systems, there are built-in monitoring systems that can detect various issues. One of the possible non-urgent alarms that can be triggered is "Baja Humedad" which means low humidity. This alarm would indicate that the humidity level in the environment being controlled is lower than the desired range. It is important to monitor and address this issue to ensure optimal conditions for the equipment or processes relying on the climate control system.

    Rate this question:

  • 23. 

    En grupos electrógenos Onan, la Pre-alarma de presión de aceite, opera a un valor de:

    • A.

      20 PSI

    • B.

      10 PSI

    • C.

      30 PSI

    • D.

      40PSI

    Correct Answer
    A. 20 PSI
    Explanation
    The correct answer is 20 PSI. In Onan generator sets, the pre-alarm for oil pressure operates at a value of 20 PSI. This means that when the oil pressure in the generator drops to 20 PSI or below, the pre-alarm will be triggered, indicating a potential issue with the oil pressure. This early warning system allows for timely maintenance or troubleshooting to prevent any damage to the generator.

    Rate this question:

  • 24. 

    En la prueba de alarma de falla de red, para provocar la falla de red, por lo general se desconecta el:

    • A.

      Interruptor general de baja tensión

    • B.

      Interruptor general de alta tensión

    • C.

      Interruptor general

    • D.

      Interruptor automático

    Correct Answer
    A. Interruptor general de baja tensión
    Explanation
    In the network failure alarm test, the low voltage main switch is usually disconnected to provoke the network failure. This is because the low voltage main switch controls the flow of electricity to the entire network and disconnecting it would result in a complete shutdown of the network. The high voltage main switch and the automatic switch may also control the flow of electricity, but the low voltage main switch is typically the one that is disconnected in this scenario.

    Rate this question:

  • 25. 

    En las plantas de corriente directa, para un sistema de 24 celdas, la alarma por alto voltaje de distribución está ajustada a:

    • A.

      57.5V

    • B.

      45V

    • C.

      55V

    • D.

      47V

    Correct Answer
    A. 57.5V
    Explanation
    The correct answer is 57.5V. In a direct current power plant with a system of 24 cells, the high voltage distribution alarm is set at 57.5V. This means that if the voltage exceeds this threshold, the alarm will be triggered to alert operators of a potential issue with the distribution of voltage.

    Rate this question:

  • 26. 

    En las plantas de corriente directa, para un sistema de 24 celdas, la alarma por bajo voltaje de distribución está ajustada a:

    • A.

      47V

    • B.

      45V

    • C.

      55V

    • D.

      57.5V

    Correct Answer
    A. 47V
    Explanation
    In direct current power plants, the alarm for low voltage distribution is set at 47V for a system of 24 cells. This means that if the voltage drops below 47V, the alarm will be triggered to alert the operators of the low voltage condition.

    Rate this question:

  • 27. 

    En los equipos de supervisión, pueden monitorear señales de voltaje o corriente mediante el uso de transductores

    • A.

      Entradas analógicas

    • B.

      Entradas binarias

    • C.

      Salidas de Relevador.

    • D.

      Fuente de alimentación.

    Correct Answer
    A. Entradas analógicas
    Explanation
    In supervision teams, they can monitor voltage or current signals using transducers. The given answer, "Entradas analógicas" (analog inputs), is correct because analog inputs allow for the measurement and monitoring of continuous signals, such as voltage and current. This means that the supervision team can accurately monitor and analyze the signals using analog inputs.

    Rate this question:

  • 28. 

    En los equipos de supervisión, se utilizan para detectar alarmas de los equipos de alimentación, además se pueden conectar alarmas provenientes de equipos de conmutación a transmisión en:

    • A.

      Entradas binarias

    • B.

      Entradas analógicas

    • C.

      Leds.

    • D.

      Puerto de Comunicaciones.

    Correct Answer
    A. Entradas binarias
    Explanation
    In supervisory teams, binary inputs are used to detect alarms from power equipment. Additionally, alarms from switching equipment can also be connected to transmission through binary inputs.

    Rate this question:

  • 29. 

    En los grupos electrógenos, el bloqueo de presión de aceite, opera a un valor de:

    • A.

      10 PSI

    • B.

      20 PSI

    • C.

      30 PSI

    • D.

      40PSI

    Correct Answer
    A. 10 PSI
    Explanation
    The correct answer is 10 PSI. In a generator, the oil pressure cutoff operates at a value of 10 PSI. This means that if the oil pressure drops below 10 PSI, the generator will be shut down to prevent damage to the engine.

    Rate this question:

  • 30. 

    En los grupos electrógenos es común tomar la señal de planta en operación de:

    • A.

      El contactor de emergencia

    • B.

      El interruptor de normal

    • C.

      Interruptor General

    • D.

      Interruptor automático

    Correct Answer
    A. El contactor de emergencia
    Explanation
    En los grupos electrógenos es común tomar la señal de planta en operación del contactor de emergencia. Esto se debe a que el contactor de emergencia es el dispositivo encargado de conectar y desconectar la energía eléctrica de emergencia en caso de un corte de suministro eléctrico. Por lo tanto, al tomar la señal de planta en operación del contactor de emergencia, se puede monitorear si el grupo electrógeno está funcionando correctamente y si está suministrando energía eléctrica de emergencia cuando es necesario.

    Rate this question:

  • 31. 

    En los grupos electrógenos muchas veces se toma la señal de falla de red de un contacto auxiliar de:

    • A.

      El interruptor de normal

    • B.

      Interruptor General

    • C.

      Interruptor automático

    • D.

      El contactor de emergencia

    Correct Answer
    A. El interruptor de normal
    Explanation
    En los grupos electrógenos, la señal de falla de red se toma del interruptor de normal. Esto se debe a que el interruptor de normal es el encargado de conectar o desconectar la carga del generador a la red eléctrica. Cuando se produce una falla en la red, el interruptor de normal detecta esta situación y envía una señal de falla al sistema de control del grupo electrógeno. De esta manera, se activa el generador para suministrar energía de respaldo.

    Rate this question:

  • 32. 

    En los grupos electrógenos suele ocurrir que si la planta entra en operación y se termina el combustible, se produce el bloqueo por:

    • A.

      Baja presión de aceite

    • B.

      Falta de Combustible

    • C.

      Alta presión de aceite

    • D.

      Falla de Motor

    Correct Answer
    A. Baja presión de aceite
    Explanation
    Cuando un grupo electrógeno se queda sin combustible, se produce una disminución en la presión de aceite. Esto ocurre porque el combustible es necesario para mantener la presión adecuada en el sistema de lubricación del motor. Sin suficiente presión de aceite, el motor puede sufrir daños graves y dejar de funcionar correctamente, lo que resulta en un bloqueo del grupo electrógeno. Por lo tanto, la respuesta correcta es "Baja presión de aceite".

    Rate this question:

  • 33. 

    En operación normal del grupo electrógeno, la velocidad (medida en frecuencia generada) debe estar en:

    • A.

      60 + - 1 Hz

    • B.

      63 + - 1 Hz

    • C.

      65 + - 1 HZ

    • D.

      58 + - HZ

    Correct Answer
    A. 60 + - 1 Hz
    Explanation
    The correct answer is 60 + - 1 Hz. In normal operation of a generator, the speed or frequency generated should be around 60 Hz, with a tolerance of plus or minus 1 Hz. This ensures that the generator is operating within the acceptable range and providing a stable and consistent power output.

    Rate this question:

  • 34. 

    En plantas Lorain, en general, si se tiene una batería con capacidad total de 2000 Ah en 8 horas, la carga de igualación debe desconectar a una corriente de batería de:

    • A.

      20 A

    • B.

      10 A

    • C.

      30 A

    • D.

      15 A

    Correct Answer
    A. 20 A
    Explanation
    La carga de igualación debe desconectar a una corriente de batería de 20 A.

    Rate this question:

  • 35. 

    En un tablero de Selmec tipo C, las alarmas de bloqueo del G.E. y falla de red se conectan en puntos de la tablilla:

    • A.

      TB3

    • B.

      TB1

    • C.

      TB19

    • D.

      TB5

    Correct Answer
    A. TB3
    Explanation
    Las alarmas de bloqueo del G.E. y falla de red se conectan en el punto TB3 de la tablilla de un tablero de Selmec tipo C.

    Rate this question:

  • 36. 

    Entre sus funciones principales están mantenimiento y operación, alarmas, configuración de circuitos y servicios de Red Inteligente.

    • A.

      CNS

    • B.

      CAR

    • C.

      CAO

    • D.

      TMN

    Correct Answer
    A. CNS
    Explanation
    CNS stands for Circuit Network Supervisor. The given statement mentions that one of the main functions of this role is the configuration of circuits and services of Intelligent Network. Therefore, CNS is the most suitable option as it aligns with the mentioned responsibilities.

    Rate this question:

  • 37. 

    Es el ajuste del tiempo de retransferencia que se realiza a los grupos electrógenos

    • A.

      3 a 5 minutos

    • B.

      10 a 25 minutos

    • C.

      5 a 10 minutos

    • D.

      15 a 20 minutos

    Correct Answer
    A. 3 a 5 minutos
    Explanation
    This statement explains that the time of retransfer adjustment for the generator groups is between 3 to 5 minutes.

    Rate this question:

  • 38. 

    Es el ajuste del tiempo de desfogue a baja capacidad que se realiza a los grupos electrógenos

    • A.

      3 a 5 minutos

    • B.

      10 a 25 minutos

    • C.

      5 a 10 minutos

    • D.

      15 a 20 minutos

    Correct Answer
    A. 3 a 5 minutos
    Explanation
    The correct answer is 3 to 5 minutes. This is the time adjustment for low capacity venting that is done on the generator sets.

    Rate this question:

  • 39. 

    Es el ajuste del tiempo de desfogue a alta y media capacidad que se realiza a los grupos electrógenos

    • A.

      10 a 25 minutos

    • B.

      5 a 10 minutos

    • C.

      15 a 20 minutos

    • D.

      3 a 5 minutos

    Correct Answer
    A. 10 a 25 minutos
    Explanation
    This question is asking about the adjustment of the venting time for high and medium capacity generators. The correct answer is "10 to 25 minutes." This means that the venting process for these generators should take between 10 and 25 minutes.

    Rate this question:

  • 40. 

    Es la forma de probar una alarma por alto o bajo voltaje de distribución en plantas de C.D. sin fuente auxiliar

    • A.

      Extraer la tarjeta de alarma de alto bajo voltaje y ajustar el valor nominal y estimar el ajuste en la escala

    • B.

      Extraer la tarjeta de alarma de bajo voltaje y ajustar el valor nominal y estimar el ajuste en la escala

    • C.

      Extraer la tarjeta de alarma de alto voltaje y ajustar el valor nominal y estimar el ajuste en la escala

    • D.

      Option 4

    Correct Answer
    A. Extraer la tarjeta de alarma de alto bajo voltaje y ajustar el valor nominal y estimar el ajuste en la escala
    Explanation
    The correct answer is to extract the high-low voltage alarm card and adjust the nominal value and estimate the adjustment on the scale. This is the appropriate way to test an alarm for high or low distribution voltage in DC plants without an auxiliary source. By extracting the alarm card and adjusting the nominal value, one can accurately assess the voltage and make necessary adjustments based on the scale.

    Rate this question:

  • 41. 

    Es una de las acciones a realizar cuando se tiene una falla por largo tiempo de arranque en un grupo electrógeno

    • A.

      Verificar la operación del solenoide auxiliar de arranque

    • B.

      Verifica la operación del regulador de voltaje

    • C.

      Verifica la operación del sensor de voltaje de emergencia

    • D.

      Verifica la operación de los diodos rectificadores de la excitatriz.

    Correct Answer
    A. Verificar la operación del solenoide auxiliar de arranque
    Explanation
    One of the actions to be taken when there is a long starting time failure in a generator is to check the operation of the auxiliary starting solenoid. This means that the solenoid responsible for starting the generator may be malfunctioning, causing the long starting time. By verifying its operation, one can identify if it needs to be repaired or replaced to fix the starting issue.

    Rate this question:

  • 42. 

    Es una de las causas por las que alarma un inversor

    • A.

      Falla de salida o no voltaje de salida

    • B.

      Falla de salida o voltaje de salida

    • C.

      Falla de voltaje de entrada o no voltaje de salida

    • D.

      Falla de entrada o no voltaje de salida

    Correct Answer
    A. Falla de salida o no voltaje de salida
    Explanation
    This answer suggests that one of the reasons why an investor would be alarmed is if there is a failure or lack of output voltage. This means that the device or system being invested in is not producing the expected or required output voltage, which can be a sign of malfunction or inefficiency. This can be concerning for an investor as it may indicate potential problems with the investment and its ability to deliver the desired results.

    Rate this question:

  • 43. 

    Es una de las causas por las que se produce la alarma falla de rectificador

    • A.

      Fusible fundido

    • B.

      Falla de salida o no voltaje de salida

    • C.

      Falla de salida o voltaje de salida

    • D.

      Fusible incorrecto

    Correct Answer
    A. Fusible fundido
    Explanation
    The correct answer is "Fusible fundido". This means that one of the causes for the rectifier alarm failure is a blown fuse. When a fuse is blown, it interrupts the electrical circuit and prevents the rectifier from functioning properly. This can lead to a failure in the output or no output voltage. Using an incorrect fuse can also cause issues, but in this case, the correct answer is specifically referring to a blown fuse.

    Rate this question:

  • 44. 

    Es una de las formas utilizadas para probar la alarma de carga en igualación en una planta de C.D.

    • A.

      Colocando el interruptor flotación/igualación en la posición igualación de un rectificador

    • B.

      Se oprime el botón de desconexión, también debe dejarse unos instantes hasta que disminuya la corriente transitoria.

    • C.

      Se realiza la desconexión del circuito o la transferencia al de reserva.

    • D.

      Option 4

    Correct Answer
    A. Colocando el interruptor flotación/igualación en la posición igualación de un rectificador
    Explanation
    This answer suggests that in order to test the load alarm in equalization in a DC plant, one must place the float/equalization switch in the equalization position of a rectifier. Then, the disconnect button should be pressed and the transient current should be allowed to decrease before disconnecting the circuit or transferring to the reserve.

    Rate this question:

  • 45. 

    Es una de las opciones en la cual se puede probar la alarma de carga de igualación en una planta de c.d.

    • A.

      Se oprime el botón de prueba del circuito de igualación en la unidad de control, es necesario permanecer unos 50 segundos para provocar el incremento de corriente suficiente para activar el circuito automático

    • B.

      Se oprime el botón de desconexión, también debe dejarse unos instantes hasta que disminuya la corriente transitoria.

    • C.

      Se realiza la desconexión del circuito o la transferencia al de reserva.

    Correct Answer
    A. Se oprime el botón de prueba del circuito de igualación en la unidad de control, es necesario permanecer unos 50 segundos para provocar el incremento de corriente suficiente para activar el circuito automático
    Explanation
    Pressing the test button on the equalization circuit in the control unit for about 50 seconds is necessary to generate enough current increase to activate the automatic circuit.

    Rate this question:

  • 46. 

    Es una de las verificaciones previas al arranque del grupo electrógeno

    • A.

      La temperatura del motor no debe ser menor de 50 ºC

    • B.

      La temperatura del motor no debe ser menor de 70 ºC

    • C.

      La temperatura del motor no debe ser menor de 60 ºC

    • D.

      La temperatura del motor no debe ser menor de 80 ºC

    Correct Answer
    A. La temperatura del motor no debe ser menor de 50 ºC
    Explanation
    The correct answer is "La temperatura del motor no debe ser menor de 50 ºC". This means that the motor temperature should not be lower than 50 ºC. This is an important verification to be done before starting the generator. It ensures that the motor is at a suitable temperature for operation, as running the generator with a lower temperature could cause damage or inefficient performance.

    Rate this question:

  • 47. 

    Es uno de los diferentes tipos de equipos de refrigeración

    • A.

      Equipos divididos

    • B.

      Unidades Paquete

    • C.

      Equipos de precisión

    • D.

      Evaporativos

    Correct Answer
    A. Equipos divididos
    Explanation
    The given correct answer, "Equipos divididos" (Split units), is one of the different types of refrigeration equipment. Split units consist of two separate components, an indoor unit and an outdoor unit, connected by refrigerant lines. The indoor unit contains the evaporator coil and the fan, while the outdoor unit houses the compressor and the condenser coil. This type of equipment is commonly used in residential and commercial settings for air conditioning and heating purposes.

    Rate this question:

  • 48. 

    Este es un sistema de vigilancia centralizado que puede monitorear todos los elementos de redes, tiene el potencial de integrar todos los aspectos de vigilancia de la red existente y de las tecnologías que vayan surgiendo ¿Cuál es?

    • A.

      NMA

    • B.

      RCDT

    • C.

      SISA

    • D.

      Option 4

    Correct Answer
    A. NMA
    Explanation
    NMA stands for Network Management Applications. It is a centralized surveillance system that can monitor all network elements and has the potential to integrate all aspects of existing network surveillance and emerging technologies. This system allows for efficient monitoring and management of network resources, ensuring smooth operation and identifying any issues or threats in real-time.

    Rate this question:

  • 49. 

    Esto se realiza para probar la alarma de falla de alimentación de corriente alterna al equipo de clima

    • A.

      Abrir el interruptor de alimentación en el tablero de distribución de corriente alterna

    • B.

      Abrir el interruptor de alimentación en el tablero de distribución de corriente directa

    • C.

      Cerrar el interruptor de alimentación en el tablero de distribución de corriente alterna

    • D.

      Cerrar el interruptor de alimentación en el tablero de distribución de corriente directa

    Correct Answer
    A. Abrir el interruptor de alimentación en el tablero de distribución de corriente alterna
    Explanation
    The correct answer is to open the power switch in the alternating current distribution panel. This is done in order to test the AC power failure alarm on the climate equipment.

    Rate this question:

  • 50. 

    Estos protocolos son de Barrido (polling) en el cual el dispositivo de mediación hace el barrido a los elementos de red remotos.

    • A.

      TMN

    • B.

      CNS

    • C.

      CAO

    • D.

      NMA

    Correct Answer
    A. TMN
    Explanation
    The correct answer is TMN. TMN stands for Telecommunications Management Network. This network uses polling protocols, where the mediation device scans or polls the remote network elements. TMN is a standard framework for managing and monitoring telecommunications networks. It provides a structured approach to network management and allows for efficient communication between different network elements.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • May 06, 2017
    Quiz Created by
    Hugo Lopez
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.