1.
Las actividades que cumple todo proceso de desarrollo de software son:
Correct Answer
E. Todas las anteriores
Explanation
The correct answer is "Todas las anteriores" (All of the above). This is because all the activities mentioned in the options are indeed part of the software development process. Validating the software ensures that it meets the specified requirements and functions correctly. Designing and implementing the software involves creating the architecture and coding the program. Specifying the software involves defining the requirements and features. Lastly, evolving the software refers to making updates and improvements over time. Therefore, all of these activities are essential components of the software development process.
2.
Los requerimientos de un sistema pueden ser:
Correct Answer
C. Todas las anteriores
Explanation
The correct answer is "Todas las anteriores" because the question states that the requirements of a system can be functional or non-functional. Since "Todas las anteriores" means "All of the above" in Spanish, it implies that both functional and non-functional requirements are included in the options given. Therefore, the correct answer is that the requirements of a system can be both functional and non-functional.
3.
En un proyecto de software que busca el desarrollo de un sistema financiero, ¿Cuál piensas que deberían ser los puntos tomados en cuenta para tener un buen resultado?
Correct Answer
A. Programación, Documentación y Configuración
Explanation
Para obtener un buen resultado en el desarrollo de un sistema financiero, es importante tener en cuenta la programación para garantizar que el software funcione correctamente y cumpla con los requisitos establecidos. La documentación es esencial para proporcionar instrucciones claras sobre cómo utilizar el sistema y para facilitar su mantenimiento y actualización en el futuro. La configuración también es crucial para garantizar que el sistema esté correctamente adaptado a las necesidades específicas del cliente y que funcione de manera eficiente. Por lo tanto, es necesario considerar la programación, la documentación y la configuración para lograr un buen resultado en el proyecto de software.
4.
Cuando se busca que el software ahorre uso de la memoria y el procesador, se está buscando:
Correct Answer
A. Eficiencia, por que involucra los tiempos de respuesta
Explanation
La respuesta correcta es "Eficiencia, porque involucra los tiempos de respuesta". Cuando se busca que el software ahorre uso de la memoria y el procesador, se está buscando optimizar el rendimiento del software para que pueda ejecutarse de manera más rápida y eficiente. Al minimizar el uso de recursos como la memoria y el procesador, se logra un mejor tiempo de respuesta y una mayor eficiencia en la ejecución del software.
5.
Si usted fuera un gerente de proyecto de software, ¿Qué procesos tomaría en cuanta para el desarrollo de un sistema?
Correct Answer
B. Especificación de Software, Desarrollo, Validación, Evolución de Software.
Explanation
The correct answer is "Especificación de Software, Desarrollo, Validación, Evolución de Software." As a software project manager, it is important to consider these processes for the development of a system. The specification of software involves defining the requirements and goals of the system. Development refers to the actual coding and implementation of the software. Validation ensures that the system meets the specified requirements and is functioning correctly. Lastly, the evolution of software involves maintaining and updating the system over time to adapt to changing needs and technologies.
6.
Se está desarrollando una aplicación web, para publicidad de una empresa
Correct Answer
B. Documentar como cualquier otro proyecto de software
Explanation
In this scenario, the correct answer is to document the web application like any other software project. This is because even though the problem may be simple, it is still important to document the application properly. Documenting the project will help in understanding the code, making it easier for future maintenance and updates. Additionally, it will also aid in collaboration among team members and provide a reference for any potential issues or improvements in the future.
7.
Si buscas que tu sistema sea mantenible, te enfocas en:
Correct Answer
C. El código y la documentación
Explanation
If you want your system to be maintainable, you should focus on both the code and the documentation. This means that in order to ensure the system can be easily maintained and understood by others, it is important to have well-written and organized code that is easy to read and modify. Additionally, having thorough documentation that explains the system's architecture, functionality, and any potential issues or considerations can greatly assist in the maintenance process. Therefore, both the code and the documentation are crucial for achieving maintainability.
8.
La principal ventaja de este modelo es que los servidores se pueden distribui a través de una red
Correct Answer
C. Arquitectura de repositorio
Explanation
The given statement states that the main advantage of this model is that servers can be distributed across a network. The correct answer, "Arquitectura de repositorio" (Repository architecture), aligns with this statement as it refers to a distributed architecture where data is stored in a central repository and can be accessed by multiple servers across a network. This architecture allows for efficient sharing and management of data among different servers, making it the most suitable option based on the given statement.
9.
Una empresa "X" desarrolla una aplicación de PC para el control de personal. ¿En que clasificación entra esa aplicación?
Correct Answer
B. Personalizado
Explanation
The application developed by company "X" for PC control of personnel falls into the classification of "Personalizado" (Personalized). This means that the application is specifically tailored or customized to meet the specific needs and requirements of the company. It is not a generic or off-the-shelf solution, but rather a unique and personalized application designed to suit the specific needs of the company for personnel control.
10.
Cumple con la tarea de integrar los esfuerzos dirigidos hacia la ejecución exitosa de un proyecto específico.
Correct Answer
A. Administrador de proyectos
Explanation
The correct answer is "Administrador de proyectos" because this role is responsible for integrating efforts towards the successful execution of a specific project. They coordinate and oversee all aspects of the project, including planning, organizing, and controlling resources to achieve project objectives. The project manager ensures that all team members are aligned and working towards a common goal, making them essential in the successful completion of a project.
11.
Define el alcance, recursos y tiempo requerido. Permite mantenerlos en balance a través de todo el proyecto
Correct Answer
B. Planeación
Explanation
The given answer, "Planeación" (Planning), is the correct answer because it aligns with the statement that is provided. The statement mentions that planning helps define the scope, resources, and time required for a project and allows for maintaining a balance throughout the project. Planning is an essential phase in project management where all the necessary details and strategies are determined to ensure successful project execution. Therefore, the answer "Planeación" accurately reflects the role of planning in managing project scope, resources, and time.
12.
Se recaba, analiza y procesa toda la información que tendrá incidencia en el proyecto.
Correct Answer
A. Inicio
Explanation
The given statement suggests that at the beginning of a project, all the information that will have an impact on the project is collected, analyzed, and processed. This is the initial phase where the project team gathers all the necessary data and information to understand the project requirements, objectives, and constraints. It is a crucial step to ensure that the project starts on the right track and all relevant information is considered before proceeding with the execution phase.
13.
Dirigir, reunirse con el equipo, resolver problemas y asegurar recursos
Correct Answer
B. Ejecución
Explanation
The given answer "Ejecución" is correct because it refers to the act of carrying out or implementing a plan or strategy. In the context of the question, the activities mentioned (dirigir, reunirse con el equipo, resolver problemas y asegurar recursos) are all part of the execution phase of a project or task. This phase involves actively managing and supervising the team, addressing any issues that arise, and ensuring that the necessary resources are available for the successful completion of the project.
14.
Vigila las desviaciones del plan, emprende acciones correctivas, recibe y evalúa cambios en los proyectos solicitados.
Correct Answer
B. Control
Explanation
The given statement suggests that the task involves monitoring and addressing any deviations from the plan, implementing corrective actions, and evaluating changes in requested projects. This aligns with the concept of "Control," which refers to the process of ensuring that the project is progressing according to the plan and taking necessary actions to keep it on track.
15.
Antes de comenzar la ejecución de un proyecto, es necesario tomarse el tiempo para desglosar el proyecto en tareas de manera que se pueda programar la ejecución de estas tareas y determinar los recursos que deben movilizarse.
Correct Answer
A. Preparación
Explanation
Before starting the execution of a project, it is necessary to take the time to break down the project into tasks so that the execution of these tasks can be scheduled and the resources that need to be mobilized can be determined. This process is called "Preparación" or preparation. It involves identifying and organizing the tasks required for the project and determining the necessary resources and timelines for each task. This step is crucial in ensuring that the project is well-planned and resources are effectively utilized.
16.
Es uno de los aspectos esenciales de un proyecto ya que constituye el punto de referencia del trabajo una vez ejecutado.
Correct Answer
B. Documentación
Explanation
La documentación es uno de los aspectos esenciales de un proyecto porque proporciona un registro detallado y completo de todas las actividades, decisiones y resultados del proyecto. Esta documentación sirve como punto de referencia para el trabajo una vez que se ha ejecutado, lo que permite a los miembros del equipo y a otras partes interesadas comprender y evaluar el proyecto en su conjunto. Además, la documentación también facilita la comunicación y colaboración entre los miembros del equipo, ya que todos tienen acceso a la misma información y pueden hacer referencia a ella en cualquier momento.
17.
Una vez que el proyecto ha finalizado, es buena idea que el contratista se asegure de haber cumplido con las especificaciones
Correct Answer
A. Validación
Explanation
After the project has been completed, it is a good idea for the contractor to validate that they have met the specifications. This means confirming that all the requirements and expectations outlined in the project specifications have been successfully fulfilled. Validating the work ensures that it aligns with the agreed-upon standards and meets the client's needs. It helps to ensure quality and customer satisfaction, as well as avoid any potential issues or disputes that may arise later on.
18.
Es un factor importante cuando se establece el plan de un proyecto y cuando ya está encaminado
Correct Answer
B. Comprensión de restricciones
Explanation
La comprensión de restricciones es un factor importante tanto al establecer el plan de un proyecto como cuando ya está en marcha. Las restricciones pueden incluir limitaciones de tiempo, recursos, presupuesto y cualquier otro factor que pueda afectar la ejecución del proyecto. Comprender estas restricciones es esencial para garantizar que el proyecto se desarrolle de manera eficiente y se cumplan los objetivos establecidos.
19.
Es la selección y asignación de prioridades del proyecto, ya que depende del balance apropiado del tiempo y recurso para satisfacer objetivos específicos.
Correct Answer
B. Identificación del proyecto
Explanation
The correct answer is "Identificación del proyecto". This is because the given statement mentions that it is about the selection and assignment of project priorities, which is dependent on identifying the project itself. The other options mentioned, "Alcance de las metas" (Scope of goals) and "Comprensión de riesgos" (Understanding risks), do not directly relate to the concept of selecting and assigning project priorities.
20.
Implica algo que se prevé que puede funcionar mal, por lo que la planeación debe anticiparse a todos aquellos que puedan interferir en su adecuado desarrollo
Correct Answer
B. Comprensión de riesgos
Explanation
This answer is correct because it accurately identifies the concept of "comprensión de riesgos" which translates to "understanding of risks" in English. The given explanation states that it implies something that is expected to go wrong, so planning should anticipate any factors that may interfere with its proper development. This aligns with the understanding of risks, as it involves identifying potential risks and developing strategies to mitigate them in order to ensure the successful completion of a project or goal.
21.
Determinación de gastos e ingresos durante la vida del proyecto
Correct Answer
B. Costos
Explanation
The given answer "Costos" is correct because the phrase "Determinación de gastos e ingresos durante la vida del proyecto" translates to "Determination of costs and income during the life of the project." This indicates that the focus is on the costs involved in the project, rather than the time or resources.
22.
Es la disciplina de organizar y administrar recursos de manera tal que se pueda culminar todo el trabajo requerido en el proyecto dentro del alcance, tiempo y coste definidos
Correct Answer
C. Gestión de proyectos
Explanation
The given statement describes the discipline of organizing and managing resources in a way that allows for the completion of all the required work in a project within the defined scope, time, and cost. This discipline is commonly known as "Gestión de proyectos" in Spanish, which translates to "Project Management" in English. Project management involves planning, coordinating, and controlling various aspects of a project to ensure its successful completion.
23.
En esta actividad se incluyen estimaciones de costo y tiempo, y justifica por qué el contrato del proyecto se debe dar a una organización/equipo en particular.
Correct Answer
C. Redacción de la propuesta
Explanation
The correct answer is "Redacción de la propuesta". In this activity, the project proposal is written and presented, which includes cost and time estimates. This is important because it justifies why the project contract should be given to a particular organization or team. The proposal outlines the details of the project, including its objectives, deliverables, and budget, and persuades the decision-makers to choose the organization or team based on their capabilities and expertise in fulfilling the project requirements.
24.
Se refiere a la identificación de actividades, hitos y entregas del proyecto
Correct Answer
A. Planificación y calendarización del proyecto
Explanation
The given answer, "Planificación y calendarización del proyecto" (Planning and scheduling of the project), is the correct answer because it aligns with the given statement which refers to the identification of activities, milestones, and deliverables of the project. Planning and scheduling involve creating a roadmap for the project, determining what needs to be done, when it needs to be done, and how it will be done. This helps in organizing and managing the project effectively, ensuring that all tasks are completed on time and within budget.
25.
Surgen en el interior de un proyecto debido a problemas en su ejecución o a los recursos disponibles
Correct Answer
B. Endógenas
Explanation
The correct answer is "Endógenas". Endógenas refers to conflicts that arise within a project due to issues in its execution or the available resources. These conflicts are internal to the project and are not influenced by external factors.
26.
Es una actividad relacionada con la estimación de los recursos requeridos para llevar a cabo el plan del proyecto
Correct Answer
A. Estimación de costos del proyecto
Explanation
The given correct answer, "Estimación de costos del proyecto," refers to the activity of estimating the resources required to carry out the project plan. This involves determining the costs associated with the project, including materials, labor, and other expenses. Estimating project costs is crucial for effective budgeting and financial planning, ensuring that the project is financially viable and that resources are allocated appropriately.
27.
Es la planeación, organización, dirección y control de los recursos para lograr un objetivo a corto plazo
Correct Answer
B. Administración de proyectos
Explanation
The given answer "Administración de proyectos" is the correct answer because it accurately describes the process of planning, organizing, directing, and controlling resources to achieve a short-term objective. This term is commonly used in the field of project management to refer to the overall management and coordination of a specific project.
28.
Al completar el alcance total de un proyecto con calidad, a tiempo y dentro del presupuesto, proporciona una gran satisfacción
Correct Answer
B. Beneficios de administración
Explanation
La respuesta "Beneficios de administración" es correcta porque al completar el alcance total de un proyecto con calidad, a tiempo y dentro del presupuesto, se logran los objetivos de la gestión y se obtienen beneficios para la organización. Esto incluye la satisfacción de los clientes, el logro de los resultados esperados, el cumplimiento de los plazos y el control de los costos. Estos beneficios contribuyen a mejorar la eficiencia y eficacia de la administración de proyectos y a garantizar el éxito del proyecto en general.
29.
El gestor debe conocer el progreso del proyecto con los costos anuales y los planificados
Correct Answer
B. Supervisión y revisión
Explanation
Supervisión y revisión son necesarios para que el gestor pueda conocer el progreso del proyecto con los costos anuales y los planificados. A través de la supervisión, el gestor puede monitorear el avance del proyecto y asegurarse de que se esté cumpliendo con los objetivos establecidos. La revisión permite al gestor analizar los costos anuales y los costos planificados, identificar desviaciones y tomar las medidas necesarias para corregirlas. Estas actividades son fundamentales para garantizar el éxito del proyecto y la eficiencia en el uso de los recursos.
30.
Los gestores, generalmente, seleccionan a las personas que trabajarán en su proyecto, o establecen un equipo ideal mínimo para el proyecto.
Correct Answer
B. Selección y evaluación del presonal
Explanation
The correct answer is "Selección y evaluación del personal." The passage states that managers typically select the people who will work on their project or establish a minimum ideal team for the project. This aligns with the concept of "Selección y evaluación del personal," which refers to the process of selecting and evaluating the personnel for a project.
31.
Deben redactar documentos concisos y coherentes que resuman la información crítica de los informes detallados del proyecto.
Correct Answer
A. Redacción y presentación de informes
Explanation
The given answer, "Redacción y presentación de informes" (Writing and presenting reports), is the correct answer because it directly relates to the requirement of writing concise and coherent documents that summarize critical information from detailed project reports. This task involves the skill of effectively communicating project information through written reports, ensuring clarity and coherence in the presentation of information.
32.
La _______ administra los procesos internos del mismo, donde realmente se efectúa el trabajo
Correct Answer
B. Función del proyecto
Explanation
The given statement suggests that the "Función del proyecto" is the correct answer. This is because the sentence mentions that this function administers the internal processes of the project, where the actual work is carried out. This implies that the "Función del proyecto" is responsible for managing and overseeing the execution of the project's tasks and activities.
33.
Durante la ejecución del proyecto, el costo y dotación de recursos es:
Correct Answer
A. Alto
Explanation
Durante la ejecución del proyecto, el costo y dotación de recursos es alto. Esto significa que se requerirá una gran cantidad de recursos financieros y materiales para llevar a cabo el proyecto, lo cual puede implicar un mayor gasto y esfuerzo por parte del equipo. Este nivel de costo y dotación de recursos alto puede estar relacionado con la complejidad del proyecto, la magnitud de las tareas a realizar o la necesidad de contar con personal altamente especializado.
34.
Durante el proceso de contratación, una vez realizada la evaluación técnica y propuesto un adjudicatario, es importante:
Correct Answer
A. Negociar términos económicos y contractuales
Explanation
During the hiring process, once the technical evaluation has been conducted and a contractor has been proposed, it is important to negotiate the economic and contractual terms before proceeding with the contract. This step ensures that both parties are in agreement regarding the financial aspects and other contractual obligations before officially signing the contract. The negotiation allows for any necessary adjustments or clarifications to be made, ensuring a smoother execution of the contract.
35.
En la valoración de riesgos, aquellos riesgos que necesitan ser monitorizados o rquieren la implementación de planes de actuación detectivos, son aquellos que tienen:
Correct Answer
B. Menor probabilidad de ocurrencia o impacto
Explanation
In risk assessment, risks that need to be monitored or require the implementation of detective action plans are those with a lower probability of occurrence or impact. These risks may not occur frequently, but they have the potential to cause significant harm or damage if they do occur. Therefore, it is important to closely monitor these risks and have plans in place to detect and mitigate them effectively.
36.
De la etapas de la fase de planificación de un proyecto, ¿Cuál es estratégica?
Correct Answer
B. Revisión de objetivos del proyecto, revisión de hitos y responsables.
Explanation
The strategic phase of project planning involves reviewing project objectives, milestones, and responsible parties. This step is crucial in determining the overall direction and goals of the project. By reviewing objectives, milestones, and responsible parties, the project team can ensure that they are aligned with the organization's strategic goals and that the project is on track to achieve its intended outcomes. This phase helps in setting a clear vision and roadmap for the project, guiding the subsequent activities and tasks.
37.
La planificación orientada a objetivos es un enfoque metodológico del tipo
Correct Answer
B. Top down
Explanation
La planificación orientada a objetivos es un enfoque metodológico que se basa en establecer los objetivos principales de una organización o proyecto y luego desglosarlos en objetivos más específicos y detallados. Este enfoque se conoce como "top down" porque parte de la dirección o liderazgo superior hacia los niveles inferiores de la organización. En este caso, la respuesta correcta es "Top down" porque implica comenzar desde arriba y descender hacia los niveles inferiores para establecer los objetivos.
38.
Durante el proceso de evaluación de riesgos de los proyectos de una compañía, se identifica que los especialistas en lenguaje de programación JAVA son muy escasos y, por tanto es probable que no se tenga el equipo necesario. Por tanto, se decide capacitar un equipo de personas adicionales en el lenguaje de programación citado. Esta acción dentro la gestión de riesgos se conoce como:
Correct Answer
C. Aceptar el riesgo
Explanation
La acción de capacitar un equipo de personas adicionales en el lenguaje de programación JAVA se conoce como "aceptar el riesgo" dentro de la gestión de riesgos de los proyectos de una compañía. Al identificar que los especialistas en este lenguaje son escasos y que no se tiene el equipo necesario, la compañía toma la decisión de aceptar el riesgo y capacitar a un equipo adicional para mitigar esta falta de recursos.
39.
Es una causa frecuente de fracaso en los proyectos.
Correct Answer
A. Literales a y b
Explanation
The correct answer is "Literales a y b". This means that both options a and b are correct explanations for the given statement. Option a states that unrealistic execution deadlines can be a frequent cause of failure in projects. Option b suggests that lack of dedication from the project manager can also contribute to project failure. Both of these factors can lead to unsuccessful project outcomes.
40.
Algunos elementos a tomar en cuenta cuando se determinan las especificaciones del proyectos son:
Correct Answer
A. Cada actividad debe ser observable y evaluable en cuanto a su copmlejidad
Explanation
The given answer states that one of the elements to consider when determining project specifications is that each activity should be observable and evaluable in terms of its complexity. This means that it should be possible to measure and assess the complexity of each activity in order to effectively plan and manage the project. This helps in understanding the level of effort required for each activity and ensures that they can be properly executed and monitored.
41.
Son problemas típicos de la gestión de proyectos, excepto
Correct Answer
B. Contar con una base de datos de recursos actualizada
Explanation
The given options are common problems in project management, except for "Counting with an updated resource database". This means that having an updated resource database is not a typical problem in project management.
42.
Una de las características de las empresas orientadas por proyectos, es que son:
Correct Answer
B. Process oriented
Explanation
An explanation for the correct answer "Process oriented" is that in project-oriented companies, the primary focus is on the processes involved in completing projects. These companies prioritize efficient and effective project management, with a strong emphasis on planning, organizing, and controlling project activities. They tend to have well-defined processes and procedures in place to ensure projects are executed smoothly and successfully. This focus on processes helps to streamline project execution, improve productivity, and achieve desired outcomes.
43.
Los proyectos son, en su mayoría, mixtos, que involucran cambios en la organización actitudes y habilidades de las personas, y:
Correct Answer
A. Cambios en los procesos
Explanation
The correct answer is "Cambios en los procesos". This is because the question states that projects mostly involve changes in the organization, attitudes and skills of people, and then lists three options. Out of these options, "Cambios en los procesos" (changes in the processes) aligns with the context of the question and is the most logical choice. It is also common for projects to involve process improvements or changes to optimize efficiency and effectiveness.
44.
La preparación de la propuesta o memoria puede ser realizada por:
Correct Answer
A. Cualquiera de los dos, dependiendo de la estrategia de la organización
Explanation
La preparación de la propuesta o memoria puede ser realizada tanto por el equipo interno de tecnología como por un proveedor, dependiendo de la estrategia de la organización. Esto significa que la organización puede optar por utilizar sus propios recursos internos de tecnología para preparar la propuesta o memoria, o puede contratar a un proveedor externo especializado en este tipo de tareas. La elección entre ambas opciones dependerá de la estrategia específica de la organización y de los recursos y capacidades disponibles.
45.
Método cuantitativo para la selección de un proyecto:
Correct Answer
C. Periodo de Retorno de Inversión
Explanation
The correct answer is "Periodo de Retorno de Inversión" (Return on Investment Period). This refers to a quantitative method used to select a project based on the time it takes to recover the initial investment. It calculates the time it will take for the project's cash inflows to equal the initial investment, indicating the profitability and risk of the project. By comparing the return periods of different projects, decision-makers can determine which project offers the best return on investment.
46.
Las empresas orientadas por proyectos tienen como una de sus características ser:
Correct Answer
A. Orientadas a procesos
Explanation
Las empresas orientadas por proyectos se caracterizan por estar enfocadas en la ejecución eficiente y efectiva de los proyectos. Esto implica que su enfoque principal es en los procesos necesarios para llevar a cabo cada proyecto de manera exitosa. En lugar de estar orientadas a funciones o departamentos específicos, estas empresas se organizan en torno a los procesos necesarios para completar los proyectos, lo que les permite adaptarse y asignar recursos de manera más flexible y eficiente.
47.
Como camino o ruta crítica se conoce a la:
Correct Answer
C. Cadena de actividades que determinan la duración global mínima de un proyecto
Explanation
The correct answer is "Cadena de actividades que determinan la duración global mínima de un proyecto." This is because the critical path is the sequence of activities that must be completed in order to finish the project in the shortest possible time. Any delay in any activity on the critical path will cause a delay in the project's overall duration. Therefore, the critical path determines the minimum duration of the project.
48.
Muchas organizaciones han fortalecido sus equipos de gestión de riesgos, buscando que éstos sean identificados a priori, sin embargo, lo que generalmente ocurre es que:
Correct Answer
A. Lo más usual es identificar riesgos de ejecución
Explanation
The most common situation is that organizations tend to identify risks related to execution rather than other types of risks. This means that they focus on identifying potential issues or challenges that may arise during the implementation or execution of a project or plan. They may overlook or not give enough attention to other types of risks such as strategic, financial, or operational risks. This can lead to a lack of preparedness and an inability to address these other risks in a timely manner.
49.
Persona(s) que proporciona(n) los recursos financieros para el proyecto.
Correct Answer
A. Sponsor/Patrocinador
Explanation
The correct answer is Sponsor/Patrocinador. In a project, the sponsor is the person or entity that provides the financial resources for the project. They are responsible for funding the project and ensuring that it has the necessary resources to be successful. The sponsor may also have a vested interest in the project's outcome and may provide guidance and support throughout its execution. The client, on the other hand, is the person or entity for whom the project is being carried out, and the interested parties may include stakeholders or individuals who have a stake in the project's success.
50.
Un factor crítico de éxito de un proyecto es:
Correct Answer
A. Tecnología estable
Explanation
La tecnología estable es un factor crítico de éxito en un proyecto porque garantiza que los sistemas y herramientas utilizados en el proyecto funcionen de manera confiable y sin problemas. Una tecnología estable permite que el equipo de proyecto se enfoque en las tareas y metas principales, sin tener que lidiar con interrupciones o fallas tecnológicas. Además, una tecnología estable también puede aumentar la eficiencia y la productividad del equipo, ya que no se pierde tiempo en solucionar problemas técnicos. En resumen, contar con una tecnología estable es esencial para garantizar el éxito de un proyecto.