This assessment should be used to determine if the following system objectives have been met:
Describe the systems landscape and key integration points Identify key benefits of the R2P2 system Describe how the daily operating plan is an input to employee activities Explain how MES is used by the employee in the Processing process Recognize the upstream and downstream effects of system deviations Practice navigating to the Quality Sample Selection popup window and enter test results Practice the process for consuming ingredients and producing semi-finished goods Demonstrate how to produce animal feed and scrap materials
Finished Good inventory
Cellulose batches
Staged inventory from the warehouse
None of the above
Rate this question:
Wonderware (MES)
FLEX
SAP
CIM
Answers A, B and C
Answers A, C and D
Rate this question:
The time the material was scrapped
Tote Location
Tote Dimensions
The batch number and the quantity of the material added to the batch
Rate this question:
Consumption against a production order can be entered as early as one day prior to the start of the production order and up to five days post-production, or until the production order has been sent to SAP
Consumption can only be completed real-time. Consumption corrections must be completed by a supervisor
Consumption against a production order can be entered as early as two days prior to the start of the production order and up to three days post-production
In MES, you first click on the “Consume” button to turn cheese that drops on the floor into Animal Feed
True
False
Rate this question:
True
False
Rate this question:
Raw ingredients / packaging materials are scrapped on the MES Produce screen
Raw ingredients / packaging materials are scrapped on the MES Consume screen
Cheese is scrapped on the MES Animal Feed screen
The “Batch Fully Consumed” checkbox must be selected when scrapping raw ingredients / packaging materials.
Box materials do not get consumed because boxes are non-batch-managed (non-lot) material
The system backflushes (automatically consumes) these non-lot materials
Box materials need to be manually consumed in MES
You can only “reverse-consume” box materials
Rate this question:
One
Two
None, the Attendant or Operator cannot change the status of a production order, only the Supervisor
As many as are available
Rate this question:
Every pallet of finished goods produced has a unique batch number.
Each bag of gas flush product will have a unique batch number
Each pallet of animal feed will share the same batch number: 88888888
Every pallet of a vendor’s packaging material must have a unique LFC batch number