1.
1.The __________ is the submission of a dispute to an impartial board made up of persons acquainted with the project.
Correct Answer
C. C.Arbitration
Explanation
Arbitration is the correct answer because it refers to the submission of a dispute to an impartial board. This board is composed of individuals who have knowledge and understanding of the project. Arbitration is a method of resolving disputes outside of the court system, where the board listens to both sides and makes a binding decision. It is often used as an alternative to litigation, providing a more efficient and cost-effective way to resolve conflicts.
2.
2.The ___________ automatically becomes the Architect himself in the construction site.
Correct Answer
B. B.Architect's Representative
Explanation
The Architect's Representative automatically becomes the Architect himself in the construction site. This means that the Architect's Representative has the authority to make decisions and oversee the construction process on behalf of the Architect. They act as a liaison between the Architect and the construction team, ensuring that the project is executed according to the Architect's plans and specifications. The Architect's Representative is responsible for quality control, resolving any issues that may arise, and ensuring that the project meets the Architect's vision and standards.
3.
3.Temporary Facilities are paid for by the __________.
Correct Answer
D. D.Contractor
Explanation
Temporary facilities, such as portable toilets or temporary offices, are typically required on construction sites. These facilities are necessary for the smooth functioning of the project and are usually arranged and paid for by the contractor. The contractor is responsible for managing all aspects of the construction project, including coordinating the necessary resources and ensuring that the temporary facilities are in place for the duration of the project. Therefore, it makes sense that the contractor would be the one responsible for paying for these temporary facilities.
4.
4.The Board Exam result are mandated to be release ______ days after the Exam with the project.
Correct Answer
A. A.30 days
Explanation
The correct answer is a.30 days. The sentence states that the Board Exam results are mandated to be released a certain number of days after the exam with the project. The only option that matches this requirement is 30 days, as it is the only choice that represents the specified time frame.
5.
5.How much is the MBF (Minimun Basic Fee) when the Nuclear Facility cost Php 200 M?
Correct Answer
B. B.pHp 16M
Explanation
The MBF (Minimum Basic Fee) is calculated based on a certain percentage of the total cost of the Nuclear Facility. In this case, the MBF is 8% of the total cost. Therefore, to find the MBF, we multiply Php 200M by 8%, which gives us Php 16M. Therefore, the correct answer is b.Php 16M.
6.
6.How much is the MBF when Mr. Cruz's House cost Php 20M?
Correct Answer
B. B.pHp 2.0M
Explanation
The MBF (Minimum Building Fund) is a percentage of the total cost of the house that needs to be set aside for maintenance and repairs. In this case, the MBF is 10% of Php 20M, which is Php 2.0M. Therefore, the correct answer is b.Php 2.0M.
7.
7.How much is the MBF when Mr Cruz's house 2nd Unit cost Php 10M?
Correct Answer
C. C.pHp 0.6M
Explanation
The MBF (Minimum Borrowing Factor) is a percentage that represents the minimum amount of money that needs to be borrowed in order to purchase a property. In this case, the MBF is 6% of the cost of the house. Since the cost of Mr. Cruz's house 2nd Unit is Php 10M, the MBF would be Php 0.6M (6% of Php 10M). Therefore, the correct answer is c.Php 0.6M.
8.
8.How much is the interest cost when the unpaid MBF is Php 1.0M?
Correct Answer
C. C.pHp 20,000
Explanation
The interest cost when the unpaid MBF is Php 1.0M is Php 20,000. This can be calculated by multiplying the unpaid MBF (Php 1.0M) by the interest rate. If the interest rate is 2%, then the calculation would be 1,000,000 x 0.02 = 20,000. Therefore, the correct answer is c.Php 20,000.
9.
9.Under PD 1096, habitable rooms provided with artificial ventilation of more than one-storey shall have a minimum ceiling height of the first storey at:
Correct Answer
B. B.2.70 mts.
Explanation
Under PD 1096, habitable rooms provided with artificial ventilation of more than one-storey should have a minimum ceiling height of 2.70 meters.
10.
10. Under PD 1185, automatically sprinkler system shall provided in buildings with heights over:
Correct Answer
A. A.15.0 mts.
Explanation
Under PD 1185, buildings with heights over 15.0 meters are required to have an automatically sprinkler system. This regulation ensures that taller buildings have adequate fire protection measures in place to minimize the risk of fire incidents and protect the occupants and property. The sprinkler system is designed to automatically detect and suppress fires, providing early intervention and reducing the potential for fire spread and damage.