1.
For the Architect to effectively assist and serve his client in Pre-Design Services, special training will be required leading to a broad background in __________ (Choose only one answer)
Correct Answer
C. Human Behavior
Explanation
To effectively assist and serve clients in Pre-Design Services, architects need to have a broad background in human behavior. This is because understanding how people think, behave, and interact with their environment is crucial in designing spaces that meet their needs and preferences. By studying human behavior, architects can create designs that promote well-being, functionality, and user satisfaction. Understanding human behavior also helps architects in addressing cultural, social, and psychological factors that may influence design decisions.
2.
A study to determine the viability of a project such as its cost of development versus its potential return to the owner.
Correct Answer
C. Economic Feasibility Studies
Explanation
Economic feasibility studies involve analyzing the cost of developing a project and comparing it to the potential return on investment for the owner. This study helps determine whether the project is financially viable and if the benefits outweigh the costs. It considers factors such as market demand, potential revenue, and cost estimates to assess the economic feasibility of the project. Therefore, economic feasibility studies are the most suitable option for determining the viability of a project in terms of its cost of development and potential return to the owner.
3.
A detailed analysis of the site to develop its potential through the proper use of Land.
Correct Answer
A. Site Utilization and Land-Use Studies
Explanation
Site Utilization and Land-Use Studies involve conducting a detailed analysis of a site to determine its potential and how it can be optimally used. This includes studying the physical characteristics of the land, such as its topography and soil conditions, as well as considering the surrounding environment and any legal or regulatory restrictions. By understanding these factors, planners and developers can make informed decisions about how to best utilize the site, whether it be for residential, commercial, or industrial purposes. This process helps ensure that the land is used efficiently and effectively, maximizing its value and potential.
4.
Under "Method of Compensation" what is MDPE?
Correct Answer
B. Multiple of Direct Personnel Expense
Explanation
MDPE stands for "Multiple of Direct Personnel Expense." This term refers to a method of compensation in which a certain multiple is applied to the direct personnel expense to determine the total compensation for an employee or a group of employees. This method takes into account the direct costs associated with personnel, such as salaries, wages, and benefits, and applies a predetermined multiplier to calculate the overall compensation. This approach helps organizations determine the total cost of employing personnel and allocate resources accordingly.
5.
Which UAP Document details how an Architect is selected and the ways he can be paid or compensated?
Correct Answer
C. UAP Document 208
Explanation
UAP Document 208 details how an Architect is selected and the ways he can be paid or compensated.
6.
Under Contract Document Phase in UAP Document 202 the Architect furnishes the owner not more than _____________ complete sets of all construction drawings, specifications and general conditions for purposes of bidding.
Correct Answer
C. 5
Explanation
In the Under Contract Document Phase of UAP Document 202, the Architect provides the owner with a maximum of 5 complete sets of all construction drawings, specifications, and general conditions. These sets are necessary for the purpose of bidding.
7.
Which UAP Document deals with the responsibilities of an Architect in relation to people, client, contractor, etc?
Correct Answer
A. 200
Explanation
UAP Document 200 deals with the responsibilities of an Architect in relation to people, client, contractor, etc. This document outlines the ethical and professional obligations that architects have towards various stakeholders involved in a project, including the people affected by the project, the client who hires the architect, and the contractor who executes the project. It provides guidelines for architects to ensure that they prioritize the well-being and safety of all parties involved and maintain professional integrity throughout the project.
8.
What is C.P.D.?
Correct Answer
A. Continuing Professional Development
Explanation
Continuing Professional Development (CPD) refers to the ongoing process of learning and development that professionals engage in to enhance their knowledge, skills, and abilities in their respective fields. It involves activities such as attending workshops, conferences, and training programs, as well as self-directed learning through reading, research, and reflection. CPD is important for professionals to stay updated with the latest trends, advancements, and best practices in their industries, and to maintain their competence and professionalism throughout their careers. Therefore, the correct answer is Continuing Professional Development.
9.
Fill in the blank / Identification:What is IAPOA?
Correct Answer
Integrated Accredited Professional Organization of Architects
Explanation
IAPOA stands for Integrated Accredited Professional Organization of Architects. This organization is a collective body of architects who have obtained accreditation and are recognized as professionals in their field. The purpose of IAPOA is to provide a platform for architects to collaborate, share knowledge, and promote the highest standards of the architectural profession. By being a part of IAPOA, architects can enhance their professional development, network with other professionals, and contribute to the advancement of the architectural industry.
10.
Which does not belong to the group?
Correct Answer
E. Architect's Liability pHase
Explanation
The Architect's Liability Phase does not belong to the group because it is not a phase in the architectural design and construction process. The other options, Schematic Design Phase, Design Development Phase, Contract Documents Phase, and Construction Phase, are all stages that are typically followed in the architectural design and construction process. However, the Architect's Liability Phase is not a recognized phase and does not fit into this sequence.